My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Y <br /> Project Representative's Daily Report Page I of <br /> Report No. 49 <br /> Date: 9110196 <br /> Architect: Strekalovsky&Holt, Inc. Darr: T <br /> Project: 1 ashpee Town Hall Contractor D'Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather 8:00 AM Cldylrainlfog Noon: Cldylfog patches 4 PM: Cldy <br /> Temperature: 8:00 AM 67 Neon: 74 4PM: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect, Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 9 Job Supt. 7 <br /> Masonry 1 <br /> Subcontractors: <br /> Rons Excavating 7 <br /> JJ Enterprises 1 1 <br /> Ramtech (Abatement) <br /> Reardon Elec 1 ? <br /> TOTAL 101 <br /> Notes: Abatement sub-contractor removed 276 LF of lead contaminated rake board from <br /> north gable end of south wing. 75 sq. ft of VAT has been removed from the new <br /> treasurerltax collectors area, north wing. <br /> After removal of contaminated trim, masons resumed work on staged north wall, <br /> south ging. Electrician resumed work on underground power. A combined pour <br /> f both 3000 psi 314 stone and 3000 psi pea gravel for a total of 20 yds of concrete <br /> was used to complete the underground duct bank from the chiller pad into the bldg. <br /> The duct bank from the chiller pad, south was reinforced with rebar for a distance of <br /> 0"=1-. the 314 mix was used over the shallow end of the chiller piping end, while <br /> the electrical conduit was encased with the pea gravel mix. The demolition sub- <br /> contractor continued with bldg. clean-up In both the north and south wings an floors <br /> while the equipment operator cleaned-up excavation debris from the east side of <br /> site in anticipation of a delivery of steel this Friday, Sept. 13., 1996. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> 2.Work performed by subcontractors 11.Variations from plans and specs.,instigator,action <br /> .fork Items or extra started taken,contrs.seeking compen., item,labor and <br /> 4.Work items or extra completed materials <br /> 6. Potential or encountered delays 12, Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> 6.Testing or inspection 14.Work not meeting specifications <br /> g.Equipment on site 16. Items in 14 not corrected. <br /> Copies too. Staff Signed: <br />