My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page I of I <br /> Report No. 4i <br /> Date: 919196 <br /> Architect: Strekalovsky& Hoit, Inc. Day: <br /> Project: Mashpee Town Nall Contractor D'Agrostlno Associates <br /> Superintendent: Len paoletta <br /> Weather: 6:00 AM Cldylfogrldri le Noon: Cldylfo dt le 4PM: Cloudy <br /> Temperature: 6:00 ASI 62 Noon: 72 4PM: 70 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 7 Job Supt. 1 <br /> Masonry <br /> Subcontractors: <br /> JJ Enterprises 1 2 <br /> Viking Industries 2 2 <br /> TOTAL 81 <br /> Notes: Masons removed staging from around elevator hoistway, and set up same at north <br /> wall exterior of south wing in preparation for work this area. <br /> Demolition crew continued with site clean up. <br /> Writer took opportunity and reminded,Job Supt. that no bitumastic coating has <br /> been applied to the roof of the temporary weatherproof enclosure at elec.power <br /> panels. <br /> Pipe fitter on site for job set-up. Dote: Field has no approved shop dw rs for boiler. <br /> Insulator on site, and finished insulating chiller piping. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs., instigator,action <br /> .Work items or extra started taken,contrs.seeking cornpen.,item, labor and <br /> .Werk items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> 9. Equipment on site 1 S. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.