My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ <br /> Project Representative's Dally Report Page I of <br /> Report No. 52 <br /> Date: 9193196 <br /> Architect: Strekalovsky&Holt, Inc. Day: F <br /> Project: Mashpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Cloudylraln Noor: Cloudylrain PM; Cid rairclfo <br /> Temperature: 8:00 AM 59 Noor: 64 4PM: 57 <br /> PERSONNEL COUNT Spec. Contractor True Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> ' ostino 9 .Job Supt. 9 <br /> i <br /> Masonry <br /> Subcontractors. <br /> JJ Enterprises 9 <br /> RSG Construction 1 <br /> i <br /> TOTAL 91 <br /> Notes. Masonry crew resumed{Nark on the interior side of the south wall, north wing. <br /> Cement masons formed up andset rebar for west entrance foundation walls. The <br /> poor was a 3900 psi 314"stone mix design with a 4"slump. Pour yards were used. <br /> Demolition crew on for a half day clean-up throughout <br /> Delivery of steelbeams has been postponed until Monday 9196196. The day was <br /> too wet for working with steel. <br /> RSG continued erecting wood}oists In the overhead of first level floor. Approx. <br /> 9%of the Joists have been installed. <br /> No bitumastic coating fres been installed on weatherproof pWood roof over <br /> temporary elect power parcels despite writer reminding Job Supt on several <br /> occasions to perform same work. Writer has requested ms. Jeanine Delohgchamp <br /> to send DAgostino Assoc. a letter addressing this issue, with a copy to the Mashpee <br /> Building Inspector. <br /> Number Keir to Inspection Notes- <br /> 1. <br /> otes-1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs. seeking compen.,item,labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15. Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.