} <br /> 4 <br /> rjet Representative's Daily Report Page 9 of <br /> Report No. 5 <br /> Date: 9124196 <br /> rchite t: Strekalovsky&Molt, Inc. Darr: T <br /> Project: Mashpoe Town ball Contractor D"Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Partly cloudy Noon: Partly cloudy PM: Cloudy <br /> Temperature: :00 AM 47 Noon: 62 4PM: 59 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> force <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 1 .lob Supt. 3 4 <br /> Iron Workers 5 6 <br /> Crane Operator <br /> Subcontractors: <br /> Riordan Electric <br /> TOTAL 131 <br /> Notes: The electrical subcontractor is working primarily on lighting runs in the south <br /> wing. The temporary sewer line from Town Mall office trailers to septic pit east <br /> side of site is ruptured. triter informed both roger Halt and.leonine Delongchamp <br /> of condition and fact, that there had been no more than 6''of corer on PVC lure. <br /> Mr. Mort instructed writer-to have Gilmarten Heating make repairs to same. <br /> Writer phoned Gilmarten-no answer-so l left a message on answering machine <br /> will follow up. Carpenters are continuing to frame up partitions first level, south <br /> wing. Iron workers resumed erecting steel between north and south wing. There <br /> is much work to be alone on beam to beam plate connections. Some beams have <br /> been tack welded on one end and bolted on the other. Bolted connections have <br /> not yet been torqued, and steel is not plumb. ,Joh Supt. remarked when asked <br /> that he, personally, was going to shoot lines and plumb the steel. No bitumastic <br /> coating has been spread on the temporary roof weatherproof enclosure at the <br /> electrical power panels. The left hand reverse door,same location, is still <br /> detached. All parties have been informed of this condition. <br /> Number Key to InspectionNotes'. <br /> I.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taker,contrs.seeking comp n.,item,labor and <br /> .Work items or extra completed materials <br /> Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15.Items in 14 not corrected. <br /> opies to: Staff Signed: <br />