My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ <br /> r je t Representative's Daily Report Page 1 of I <br /> Report No. 56 <br /> Date: 9123196 <br /> Architect: strekalo sky&plait, Inc. Darr: M <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather 8:00 AM CloudylLt. fain Noon: Partly Cloud PM: Cloudy <br /> Temperature: :00 AM 50 Noon: 60 4PM: 55 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 1 ,lob Supt. <br /> Apex HVA <br /> Subcontractors: <br /> TOTAL 61 <br /> Notes: Sheet metal workers began installing duct work in overhead of corridors#2 and##3, <br /> north wing. Carpenters began framing for partition work,south-wing-first hire! <br /> floor. Existing discrepancieslopenlngs in the existing flooring are being filled and <br /> secured with plywood sub-flooring. <br /> itumastic coating has not been applied to the plywood roof of the temporary weatherpr <br /> structure at electric power panels. <br /> Dumber Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taker,contrs.seeking comp n.,item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12, Description of job incidents and remarks <br /> . serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15. Items in 14 not corrected. <br /> L . <br /> opies to: staff Signed: 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.