My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's Daily Report Page 1 of 7 <br /> Report <br /> Date: 9119196 <br /> Architect: strekalovsky& Holt, Inc. Darr: TH <br /> Project. Mashpee Town!Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM Partly sunny Noon: sunny 4PM: Sunny <br /> Temperature- 8:00 AIM 58 Noon: 70 4PM: 65 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Forem n Journeymen Helpers Total <br /> General <br /> Contractor: <br /> "A ostlno 1 Job Supp. 2 Is' <br /> Masonry <br /> Iron Workers 1 <br /> Crane Operator 1 <br /> Subcontractors: <br /> TOTAL 9� <br /> Notes: structural steel was delivered and is being erected between the north and south <br /> wings. 4"dia. PVC sewer line from town office trailers to septic pitjust east of <br /> north wing could Abe broken. Delivery of steel took place over the temporary <br /> sewer line which is only -0"=�1-below grade. The aroma which greets a persons <br /> senses is anything but fragrant. Bldg. Insp. warned glob Supt. that any wet <br /> insulation andlor bldg. materials finistres that are or could become wet and moldy <br /> must be kept dry. The Bldg. Insp. was specifically referring to the new insulation <br /> recently installed between the new trusses and the fact that there are numerous <br /> leaks in the existing roof of the south wing. Ms. Jeanine Delon champ has been <br /> notified of the above by phone. No bitumastic coating has been applied to the <br /> roof of the weatherproof structure at the temporary electrical panels. Rather the <br /> left hand reverse door has become unhinged from the structure and is being <br /> held in place by 2x stock being propped against the door. <br /> Number Key to Inspection Notes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking compen.,item,labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14,Work not meeting specifications <br /> g. Equipment on site 1 . Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.