My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Project Representative"s Dairy Deport Page 9 of I <br /> Report No. 54 <br /> Date: 9198196 <br /> Architect: strekalovsky& foit,, Inc. Day; 1111 <br /> Project: Mashpee Town Mall Contractor DAgostino Associate <br /> Superintendent: Leri Paoletta <br /> Weather: 8:00 AM rain1thndr1c1dy Noon: same 4PM:. serve <br /> Temperature: 8:00 AM 57 Noon: 62 4PM: 59 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> rce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> "Agostino I .Job Supt. <br /> Masonry <br /> Subcontractors: <br /> TOTAL 41 <br /> Notes: Mason spent day setting both beam and column bearing plates in anticipation of arrival <br /> of steel. steel has not yet arrived on job. <br /> .Elevator has arrived on site, and is being stored on the north wing. <br /> Carpenters installed insulation between trusses., south wing, and begun installing <br /> 314"tongue and groove plywood sub-floor atop new trusses. Protective plastic coating <br /> over rake of north wail, south wing, is being shredded by windy conditions. This was <br /> brought to the attention of the,Job Supt. who remarked that he would "fix it." <br /> Again... the south wing roof leafs badly and should be repaired ASAP. All work <br /> beings completed thus far in this area will be subject to water damage. <br /> No bitumastio coating has been applied to the plywood roof of the tern. weatherproof <br /> structure at the electrical power panels. This area is saoking wet. <br /> Number Key to Inspectlion Roles- <br /> 1. <br /> otes-1.Work performed by General Contractor 10.site meeting participants and discussion <br /> 2.Wori performed by Subcontractors 11.Variations from plans and specs., instigator, action <br /> .Work items or extra started taken,contrs.seeking compen., item, labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> . Serious accidents 13.Material and equipment for Installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.York not meeting specifications <br /> . Equipment on site 1 . Items in 14 not corrected. <br /> LI.X- W44_,a� <br /> Copies t : staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.