My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's ive's Dally Report Pare 2 of <br /> Report No. 59 <br /> Date: 9127196 <br /> Architect: Strekalovsky& Holt, Inc. Darr: F <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> visit to determine states of temp.sewer lime. Sewer line was found intact and <br /> had not been ruptured. Odor could have been caused by recent rain storms <br /> one of which t#dumped 6"'=/-of rain on the area in a 24 ho ur period of timeanal <br /> very well may have caused an overflow of the septic pits. <br /> A sewage odor is not discernible on site today. The Job Supt. installed a poly <br /> cover on the east side of atti , south wing, to protect recently installed <br /> insulation arra}314" T G plywood sub floor. Titer pointed out that a "dia, <br /> 1 gent remained open on the west side of attic. <br /> iw i i nr i n i�� i�r- nisr� <br /> Number Keir to Inspection Notes: <br /> 1.toric performed by General Contractor 10,Site meeting participants and discussion <br /> 2.Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking compen.,item, labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remark <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15.Items in 14 not corrected. <br /> Copies to: staff Signed: 4" <br />
The URL can be used to link to this page
Your browser does not support the video tag.