My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
} <br /> Project Representative's Daily Report Page I of I <br /> Report No. 6 <br /> Dante: 9130196 <br /> Architect: Strekalovsky& Hoit,, Inc. [day: M <br /> Project: Mashpee Town Hall Co ntracto r-D'Agostino Associates <br /> Superintendent: Leri Paoletta <br /> Weather: 8-00 AM Sunny Noor: Sunny PM: Sunny <br /> Temperature: 8:00 ALM 58 Noon: 72 4PM: 69 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D'A ostino 1 .lob Supt. 3 <br /> Subcontractors: <br /> Riordan Electric <br /> A&1 SIV Drilling <br /> Boston Drilling <br /> TOTAL 121 <br /> Notes: Carpenters are working in the north wing., installing metal stud partitions and pressed <br /> metal door frames. <br /> Electrical sub-contractor is working on power rough-in armored cable, conduit and <br /> hardware)in both the north and south wings., first floor. <br /> figgers are-continuing to frill for the elevator r piston. Boston Drilling is save <br /> cutting plumbing trenches for Millis Plumbing. <br /> ■_ i.nnr..i_ inn. i.i.i.i --- <br /> -+ i i ■i inn. i�ww <br /> ninini�wn^w <br /> Number Ivey to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Werk performed by Subcontractors 11.Variations from plans and specs.,instigator, action <br /> 3.Work items or extra started taken,contr .seeking compen.,item,labor and+ <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remark <br /> .Serious accidents 1 . Material and equipment for installation received, <br /> 7.Visitors and reasons '4 compliance to specs. <br /> .Testing or inspection 1 .Work not meeting specifications <br /> . Equipment on site 1 . Items in 14 not corrected. <br /> Copies o: staff Signed: �L, <br />
The URL can be used to link to this page
Your browser does not support the video tag.