Project Representative's Daly Report Page I of <br /> Report No. 69 <br /> Date: 9011196 <br /> Architect: Strekalovsky&Hoit, Inc. Day: T <br /> Project: Mashpee Town !fall Contractor-D'Agostino Assocla tes <br /> Superintendent: Leri Fa letta <br /> Weather: 8.00 AM Sunny Noon: Sunny PIIS: Sunny <br /> Temperature: :00 AM 53 Noon: 68 4PM: 6 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect, Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Ag stlrro 1 ,lob Supt. <br /> Masonry <br /> Subcontractors: <br /> Riordan Electric 2 2 <br /> A 111 Drilling 2 <br /> Bridgewater Steel Fabric. <br /> TOTAL <br /> [Votes: Elect. sub-contr. coat. working in both the north anal south wings on power lightingl <br /> distribution. Electricians are also installing hardware. lronworlrers painted two <br /> ,unprimed steel beams, and coat. work on clip connections. Crew has rigged up <br /> plumb lines, and are in the process of plumbing and leveling steel. When asked, <br /> the.lob Supt. replied that none of the welded connections thus far haat been wire- <br /> brushed <br /> .. --.. .,,. ..._..,�. <br /> brushed or painted, and he did not know if any of the connections that haat been <br /> re-worked and welded would be wire brushed or painted. Two beam to masonry wall <br /> connections have been partially cleaned, bort not painted. Mason resumed filling <br /> in pockets at existing masonry walls., where steel bearing plates have been installed <br /> for new steel beams. Mason also cut asphalt on west side of site in preparation for <br /> excavation work to be started on south wing areaways. A&W Riggers are continuing <br /> with the installation of the elevatorpiston casing. Carpenters are setting PM door <br /> frames in both the north and south wings, first level. Laborer removed section of <br /> bearing wall, lower level arra cleaned out plumbing trenches for Millis Plumbing. <br /> Number Key to Inspection Notes- <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,c ntr .seeking compen.,item, labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> . Serious accidents 13. Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> 9. Equipment on site 1 . Items in 14 not corrected. <br /> Copies o: Staff Signed: <br />