'v <br /> Project Representative's Daily Deport Page I of 9 <br /> Report No. 62 <br /> Date: 1013196 <br /> Architect: strekalovsky&Hoi4Inc. Deer: TH <br /> Project: Mashpee Town Hall Contractor "Agostino Associates <br /> Superintendent: Leri Paoletta <br /> Weather :00 AM Cloudy Noon: Ptly Sunny PM Ptly Sonny <br /> Temperature: 8.-00 All 65 Noon: 61 Ph : 52 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foremen Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D'Agostino I Job Supt. 3 4 <br /> Masonry 2 <br /> E1 Mechanical <br /> Apex 2 2 <br /> Subcontractors: <br /> Riordan Electric <br /> Millis Plumbing 2 2 <br /> Bridgewater Steel Fabric. 4 , <br /> TOTAL. <br /> Notes: Forms for new areaways, west side of bldg. were erected and cement masons made <br /> a 6 112 gyral concrete pour late pm. Carpenters are installing door frames in south wing <br /> first floor. Plumb lines remain on the recently installed structural steel, however, the <br /> Job Supt. remarked., when asked, all the steel is plumb. The ironworkers are in the <br /> process of installing the gala. metal roof deck. Electricians are working in both wings <br /> on rough-in power and light distribution and cable trays. MEV has one meclrank <br /> working in overhead of north wing installing un-strut hangers for supply and return <br /> Teatinglines, approx. "of each has been installed.'Apex has two tin knockers <br /> installing ductwork in first level of south wing. Millis Plumbing installed rough-ire <br /> on ground floor, south wing and has installed the domestic water line in new trench <br /> work 10-O"west of existing foundation wall. <br /> Number Keir to InspectionNotes: <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taker,contrs.seeking compen.,item,labor and <br /> 4.Work items or extra completed mat rials <br /> .Potential or encountered delays 12. Description of job incidents and remark <br /> .Serious accidents 13.Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 15, Items in 14 not corrected. <br /> Copies to: Staff Signed: V I 7�dW464� <br />