My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
06/17/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 5:52:44 PM
Creation date
7/3/2019 2:13:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
06/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ty;F[]11'N <br /> Im P Of <br /> 'Jown o ash ee Department Pubric Works <br /> 4 <br /> 350 Meetinghmse.Road <br /> Mashpee, Massachusetts 02649 <br /> Tef,ephone (58)539-1420 <br /> FaX- (508)539-38.94 <br /> MEMORANDUM <br /> June 6, 2010 <br /> TO: Board of Selectmen <br /> Rodney Collins,Town Manager <br /> FROM: Catherine Laurent, Director <br /> SUBJECT: Recommendation for Award of Contract for Annual Bid for Paving & Catch Basin <br /> Adjustment <br /> The Department of Public Works recommends that the contract for Paving & Catch Basin <br /> Adjustment be extended to MCE Dirtworks, Inc. for FY20 as follows: <br /> Class I Bituminous Concrete, furnished and placed $91.06 per ton <br /> Above, with 0.05 gallons/yard tack $91.00 per ton <br /> 6" Asphalt Curb, machine lain $5.50 per foot <br /> Boxwork $149.00 per ton <br /> Handwork, < 30 tons $160.00 per ton <br /> Handwork,�:30 tons $150.00 per ton <br /> Catch Basin Adjustment $350.00 each <br /> Cold Patch, picked up $100.00 per ton <br /> Hot Mix, picked up $91.00 per ton <br /> Grader with Operator $175.00 per hour <br /> Vibratory Roller with Operator $175.00 per hour <br /> Skid Steer with cold planing attachment $175.00 per hour <br /> Groundman with equipment and vehicle $100.00 per hour <br /> Groundman with only equipment $100.00 per hour <br /> This is the second year of a two year bid. <br /> Please do not hesitate to contact me if you have any questions on any of these recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.