Laserfiche WebLink
' L <br /> P r r <br /> MINUTES December 3 . 1992 10 BOARD OF HEALTH <br /> . 1 * Variance approved, lot 11 Pierre vernier - Mr. McQuaid <br /> informed Board members this is a pre-approved subdivision. A <br /> 201 variance from the on-site leaching facility to the <br /> onsite well is requested. <br /> Mr. Ball motioned to grant a 20f local variance from the <br /> proposed on-site well to the proposed on-site leachingfacil- <br /> ity, M . Doherty seconded, all agreed. <br /> 1. Flushing worlshop V1_� - Aonow ledged. <br /> 12, Groundwater Elevation Workshop, 12.Z8/92 - Acknowledged. <br /> i <br /> 13 , ) A.T.B.D. . community Assistance Panel Nomination Form - <br /> Acknowledged. F <br /> 14, ) variance request, Great Firer load - Board members <br /> reviewed plans submitted and concluded they were inadequate <br /> as they do not delineate the distances from abutting wells <br /> and septic systems, <br /> Mr. Greelish directed Mr. McQuaid to contact the engi- - <br /> neer• and request he resubmit plans delineating distances from <br /> all butting well and leaching facilities within 150' of the <br /> proposed on-site well and on-site leaching facility. <br /> 15, ) El r gen y Fa i lureCertification,-.. Briar Patch----Lane - <br /> Mr. McQuaid informed Board members -upon inspection the Leach <br /> p i t was found to be full.. <br /> Board members forwarded their signatures to the "Emer- <br /> gency Repair Certification" form. <br /> 9 Kanter a <br /> Mr. McQuaid informed Board members when the lot was <br /> perked no groundwater was encountered. "Dr. canter was in- <br /> formed plans must be re-engineered reversing the location of. <br /> the active and reser re, f1 <br /> Board members were of the opinion re-engineered plans <br /> would not be necessary however, the "As Built" must delineate <br /> the reserve and active in opposite locations* <br /> A. i <br /> r ■ <br /> * r ' <br /> r # <br /> r L <br />