Laserfiche WebLink
i <br /> *r <br /> MINUTES December 3 , 1992 9 BOARD of HEALTH <br /> this Board should consult with Town Counsel for his opinion <br /> on the matter. <br /> r~. Greelish informed Mr. Lander - a ley this Board male <br /> visit to the site and determined the distance from the <br /> wetlands to the proposed leaching facility does not meet the <br /> 1001 requirements as delineated on plans. "We measured from <br /> the roan high water marls to the proposed leaching facility <br /> and found a 201 discrepancy, " , <br /> Mr. Landers-Cauley explained to Board members the method <br /> used to delineate the edge of wetlands to the proposed leach- <br /> ing facility. F <br /> Mr. McQuaid informed Mr. Landers- auley that the Conser- <br /> vat-ion Commission must verify the edge of wetlands prior to <br /> this Board rendering a decision. "The owner i l l be required <br /> to retain a botanist to delineate the edge of the wetlands, <br /> i <br /> Mr. Ball motioned to continue this hearing until such i <br /> time as the Conservation Comms-ssion Agent has approved delin- <br /> eation of the wetlands, lir, Doherty seconded, all agreed <br /> 8, ) Leach pit relocation lan - 3 Florence Avenue Mr. <br /> McQuaid informed Board member 'this emergency repair was pre- <br /> viously approved by this board. 'The installer originally <br /> installed the leach pit at the same lateral location of the <br /> existing cesspool , " "An abutter complained that the new pit <br /> was located within the bounds of their property. " "An engi- <br /> neer verified that the pit was installed within the abutters <br /> lot boundaries. " "TheCinstaller relocated the pit within the <br /> confines of appr� p i ate property'." � <br /> Board members 'appr oved of the relocation. <br /> i <br /> 9, ) <br /> Excessive - pumping - 223 .Hggpnole Road - Mr. # McQuaid <br /> relayed, "the owner previously requested .to upgrade "his ex- , <br /> fisting system for environmental reasons- " "The Board denied <br /> the request due to the -close proximity of ,the pond and the <br /> stem was not in failurell : . "In reviewing the pumping record <br /> excessive pumping has taken place. P <br /> Mr, Creel fish .stated, "'given the close proximity to the <br /> pond engineering plans will be required. " <br /> Ir. Doherty motioned to require engineered plans for the <br /> emergency repair, mr. Ball seconded, all. agreed. <br />