Laserfiche WebLink
Tofon of fflaglipre <br /> ��- P. 0. BOX 1108 <br /> MASHPEE, MA 02649 <br /> PLANNING BOARD MINUTES : 7/17/85 P. 10 <br /> ------------------------------------------------------------------------ <br /> grade on the outside of the wall to the bottom which means it would be <br /> above frost level . They did not have enough room so they proposed the <br /> retaining wall . Mr . Rowley said he would check this out on the cross <br /> section. He pointed out that the rules and regulations do not say they <br /> must have a shoulder . He felt this is not a good idea . He had advised <br /> the developer that he might make recommendations for special requirements . <br /> He stated that he had not looked at the drainage . Mr . Rowley' s report on <br /> this project will be placed on the August 7th agenda . <br /> Mr . Rowley further stated that all detail must be included on the plans <br /> as submitted to the Board . This is to include storm drainage , head walls <br /> for pipe , and details for retaining walls . The plans must be complete so <br /> the burden of design does not fall to him. Mr . Rowley felt that plans are <br /> being submitted without being checked for conformity. <br /> Mr . Dubin stated that the rules and regulations should be reviewed and <br /> then emphasis should be placed on enforcement of conformity. <br /> Mr . Collins raised the matter of the houses on Asher ' s Path . He said <br /> it would be insisted that they pave 1001 . He asked if there was <br /> satisfactory drainage . Mr . Jonas said it was an old plan. Mr . Collins <br /> thought it went back to 1972 . Mr . Collins stated that he had advised the <br /> developer that Mr . Rowley would probably come up and specify what would <br /> .be required. Mr . Dubin stated that they should file a written request for <br /> inspection and give the Board a copy of the road profiles . This project <br /> was originally filed under "Peter ' s Enterprise" . Mr. Collins stated that <br /> there were two houses actually on the wrong street in that they front on <br /> Sachem Road . <br /> Mr . Rowley stated that his report would be available for the August 7th <br /> meeting relative to the release of covenant on Seabrook Shores . <br /> Ms . Stone made the motion to adjourn the meeting . This was seconded by <br /> Mr . Collins and the Board voted unanimously in favor . The meeting was <br /> adjourned at 10 : 43 p .m. <br /> Mr . Dubin reconvened the meeting at 10 : 45 p .m. He introduced a letter <br /> from Conservation relative to John' s Pond Park. The Board is awaiting <br /> Town Counsel ' s opinion. The secretary was directed to include copies of <br /> this letter in the LaCava File , the Quashnet Valley Country Club file , and <br /> the LaBute (William Mingo Road) file . Mr . Dubin directed the secretary <br /> to contact Mr . Devane of Quashnet Valley to request his presence at the <br /> August 7th meeting to discuss the locaton and status of Phinney' s Lane . <br />