Laserfiche WebLink
of <br /> Aaaljpa <br /> P. O. BOX 1 108 <br /> MASHPEE. MA 02649 <br /> PIAHNTNG BOARD MINUTES : 5/15/05 P. 8 <br /> The Board took the plan under advisement to be sure they show the Board <br /> of Health regulations of 1501 and in the meantime D- , Decker willpoint <br /> out the location of his well and septic system so that the developers <br /> can provide as much room as they can between his and those of others . <br /> Dr , Pecker asked about the location of the open space as he felt it <br /> wasn't accessible to all . hr . Dubin said the developers had already <br /> given a little more every time and the Board only has so much discretion, <br /> ir, Dubin asked for any other comments and therew wore none . The Aoard <br /> scheduled the developers to return to the June 5 weetin . Qr , DVA '' <br /> asVed "r" , Raymond to send a copy of thaplan showing the wells and <br /> soptics after he knows where Dr . Decker is , then if Dr. Decker finds a. <br /> problem he can have someone represent him on June 5 as he said he won''k, <br /> be able to attend , <br /> Fr . Dubin opened the public hearing on the article on the proposed dis- <br /> con tinuance of Job 's Fishing Rd . and the layout of a new Job 's Fisbin,,?, <br /> Rd . Or, Dubin read thenotice as advertised in the newspaper (see <br /> attached) , <br /> Hr , Dubin: OV so same exact plan. Haybe time to talk of more engineering <br /> type comments . <br /> Mr. Rowley: With regards to geometry of traffic patterns with, potential <br /> of library being on that side of road and cross movements on 151 , There <br /> is concern on my part with maybe doing something with Rte , 151 itself <br /> right at the intersection to provide some storage lanes , and deaccel-- <br /> oration lanes to get in on job 's Fishing Rd. if there is going to be <br /> development right now, especially commercial it means there will be <br /> extended traffic ,-local traffic , not just through traffic , coming to <br /> places that weren 't proposed on the other locations , Before people <br /> coming to the library from the east and the rotary would have just made <br /> a right hand turn, Now you 're crossing traffic that 's coming from 28 <br /> and west Falmouth . It looks like they have an acceleration lane coming <br /> out from job 's Fishing Rd . onto 151 headed east . it seems to me there <br /> ought to be something coming on the westerly side too so people making <br /> the turn on Job 's Fishing Rd . from the West Falmouth area will have an <br /> opportunity to do so and not slow traffic down . <br /> , 10. Marsters : Good suggestion. <br /> TOr. Trurphy: There is a traffic engineer who 's working with the developer <br /> and it 's the intention of him contacting with the planner on this , Until <br /> we have sufficient information, this Rte . ISI is the 1001 pattern , <br /> Mr. Rowley: Yes", that means reconstruction would . . . <br />