Laserfiche WebLink
*DRAFT I MAY 2020 TOWN MEETING WARRANT* Page 27 <br /> 4. At close of construction season or prior to any other long-term stops, in <br /> construction (more than two (2) weeks); and <br /> 5. Upon completion of final landscaping. <br /> B. Inspections shall be conducted using clearly defined procedures for inspections <br /> including quallifications necessary to perform the inspection, use of mandated <br /> inspection forms if appropriate, and procedure for tracking the number of site reviews, <br /> inspections and enforcement actions. This tracking shall be included as part of each <br /> annual report, as required by MS4 General Permit part 4.4. <br /> C. The applicant shall contact the Department of Public Works (DPW), to, schedule these <br /> inspections. Other 'inspections may be performed at thie discretion Of the DPW, <br /> including prior to or after a storm event. <br /> D. During the iinspections, the effectiveness of the control measures in place shall be <br /> evaluated and additional control measures may be required if deemed necessary by <br /> the DPW. <br /> or take any other action relating thereto. <br /> Submitted by the Department of Public Works <br /> Explanation: The purpose for the adoption of the existing Sedimentation, and Construction <br /> Control bylaw, at the October 2005 Town Meeting was to minimize or eliminate erosion from <br /> construction sites not already regulated through the Town's, Zoning Bylaw or Subdivision Control <br /> Law. Control of sediment on a construction site prevents it from being transported by stormwater <br /> into the Town's stormwater system and ultimately into the Town's surface and groundwaiters. <br /> This, article proposes to amend the bylaw to comply more fully with the requirements of the <br /> Town's General Storm Water Permit issued by the Environmental Protection Agency through the <br /> National Pollutant Discharge Elimination System. <br /> Article <br /> To see if the Town will vote to continue participation in the Community Septic Management <br /> Program and the Massachusetts Water Pollution Abatement Trust c 'vPT for the purpose of <br /> making loa,ns, to residents of the Town, for repairing and/oir upgrading residential septic systems <br /> pursuant to agreements between the Board of Health and residential property owners, including <br /> all costs, incidental and related thereto, or to take any other action relating thereto. <br /> Submitted by the Board, of Health <br /> Explanation: The Commonwealth of Massachusetts, through the, Water Pollution Abatement <br /> Trust, has provided approximately $660,000 oo at 0% interest to the Town of Mashpee to assist <br /> homeowners in complying with failed Title V systems since 1998. The loans are available to <br /> homeowners at 5% interest, to cover any ongoing costs of the program. Loans must be secured <br /> by a betterment assessed by the Town on the property being improved by the loan. The <br /> repayment of the loans to the town with the 5% interest is being repaid through previously issued <br /> property betterments. In order for the town to be able to re-loan funds to future additional septic <br /> projects, the, town must annually reauthorize/re-approve participation in the Community Septic, <br /> Management Program. Failure to reauthorize participation in the Program will restrict the town <br /> from re-loaning funds to homeowners with failed septic systems. The repaid monies,will be held <br /> in an account with the principle amount repaid to the MWPAT as scheduled. <br />