My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/2020 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2020-2029
>
2020
>
03/02/2020 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:31:35 PM
Creation date
9/11/2020 12:49:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
03/02/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*DRAFT I MAY 2020 TOWN MEETING WARRANT* Page 26 <br /> Add a new paragraph 14 to <br /> Plan and Application Reguirem,ent. <br /> 14. Description of construction waste management including discarded building materials, <br /> concrete truck washout, chernicals, litter and sanitary waste. <br /> Amend §84-5 Control Measures by adding new language ragraphs and re-numbering <br /> accordingly,, <br /> §84-5 Control Measures: <br /> A. Measures to prevent the erosion of soils from the property and the sedimentation of <br /> drainage structures and a�djacent wetlands throughout all phases of construction and <br /> at the completion of project shiall, at a minimum, include the following: <br /> 1. Minimize the amount of disturbed area and protect natural resources; <br /> 2. Stabilization of cleared areas within fourteen (1,4), days of clearing or extended <br /> inactivity in construction (fourteen (14) days or more) by planting of temporary <br /> vegetative cover, mulching, use of erosion control mats or similar measures, <br /> 3. Protect slopes on the construction, site; <br /> 4. Stabilization or covering of soil stockpiles at the end of each workday; <br /> 5. Prevention of blowing of dust or sediment from the site by mulching, sprinkling <br /> (water), spraying of adhesives or calcium, chloride, use of stone, particularly along <br /> construction roads, or providing wind barriers; <br /> 6. Provisions for the maintenance of the; erosion and sedimentation control <br /> measures, including protect a,11 storm drain inlets and armor all newly constructed <br /> outlets; <br /> 7. Use perimeter controls at the site; <br /> 8. Stabilize construction site entrances and exits to prevent off-site tracking; <br /> 9. Control wastes that may ble discharged, including but not limited to, discarded <br /> building, materials, concrete truck wash out, chemicals, litter, and sanitary wastes <br /> (these wastes may not be discharged to the MS4; and <br /> 10. Inspect stormwater controls at consistent intervals. <br /> 0 0 <br /> Amend §84-6 Inspections by adding new languag,e/paragraphs and re-numbering accordingly. <br /> §84-6 Inspections: <br /> A. The Director of Public Works or his her designee including mem,bers of the Site Plan <br /> Review Committee may enter upon the property of the apiplicant for the purpose of <br /> conducting regular inspections to ensure compliance with the approved Erosion and <br /> Sedimentation Control Plan and the provisions of this bylaw. These inspections shall <br /> be performed at a minimum at the following intervals: <br /> 1. Prior to the start of cons,truiction, <br /> 2. Inspection of Best Manageme,nt Practices MPs) during construction of BMPs,' <br /> 3, Inspection of BMPs upon, completion of site grading to ensure they are working as <br /> described in the, approved plans; <br />
The URL can be used to link to this page
Your browser does not support the video tag.