My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/04/2019 PLANNING BOARD Minutes
>
12/04/2019 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 9:50:00 AM
Creation date
10/26/2020 3:07:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
12/04/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Case 1:19-cv-12333 Document 1 Filed 11/13/19 Page 4 .of 21 <br /> ("Verizon Wireless") and T-Mobile Northeast, LLC ("T-Mobile"), to operate wireless <br /> telecommunications networks in the Commonwealth of Massachusetts and•the Town of Mashpee. <br /> 21. Under their FCC licenses, Verizon Wireless and T-Mobile are mandated to provide reliable <br /> wireless service to its customers. <br /> 22. Verizon Wireless proposes to mount 12 panel antennas (4 per sector) at a centerline elevation of <br /> 146' above ground levef. 12 Remote Radio Heads(RRH)with accessory junction boxes and surge <br /> suppressors are proposed to be mounted alongside the antennas. Verizon Wireless will encompass <br /> a 12' x 20' equipment lease area within the 70' x 70' fenced compound, with telco/power/fiber <br /> connections,telecommunication cabinets and a back-up power propane generator all on concrete <br /> pads within the proposed fenced compound. <br /> 23. T-Mobile is proposing to mount 12 panel antennas (3 per sector)and 12 RRH's at a centerline of <br /> 136' feet above ground level. T-Mobile will encompass a 10' x 20' lease area for its ground <br /> equipment and a 10'x 10' area for its generator. <br /> 24. As part of the Lease Agreement, Blue Sky will allow the Town of Mashpee to locate its EMS <br /> antennas free of charge at 100' aboveground level. <br /> 25. Verizon Wireless and T-Mobile have significant gaps in wireless service in southern portions of <br /> Mashpee. <br /> 26. Without the development of.the Proposed Site, Verizon Wireless and T-Mobile cannot provide <br /> reliable service to the southern portions of Mashpee. <br /> 27. As shown on the Zoning Drawings,the tower meets all fall zone and set back requirements of <br /> the Cape Cod Commission("Commission") and under the Town of Maslrpee's Bylaws, <br /> 28. Visibility of the Proposed Site from neighboring areas will be mitigated to the greatest extent <br /> possible, utilizing a monopole-type tower which maintains a narrow profile and will be <br /> manufactured in silver/gray to blend with the sky. <br /> 29. The FAA determined that no lighting will be necessary for the Proposed Site. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.