Laserfiche WebLink
Case 1:19-cv-12333 Document 1 Filed 11/13/19 Page 4 .of 21 <br /> ("Verizon Wireless") and T-Mobile Northeast, LLC ("T-Mobile"), to operate wireless <br /> telecommunications networks in the Commonwealth of Massachusetts and•the Town of Mashpee. <br /> 21. Under their FCC licenses, Verizon Wireless and T-Mobile are mandated to provide reliable <br /> wireless service to its customers. <br /> 22. Verizon Wireless proposes to mount 12 panel antennas (4 per sector) at a centerline elevation of <br /> 146' above ground levef. 12 Remote Radio Heads(RRH)with accessory junction boxes and surge <br /> suppressors are proposed to be mounted alongside the antennas. Verizon Wireless will encompass <br /> a 12' x 20' equipment lease area within the 70' x 70' fenced compound, with telco/power/fiber <br /> connections,telecommunication cabinets and a back-up power propane generator all on concrete <br /> pads within the proposed fenced compound. <br /> 23. T-Mobile is proposing to mount 12 panel antennas (3 per sector)and 12 RRH's at a centerline of <br /> 136' feet above ground level. T-Mobile will encompass a 10' x 20' lease area for its ground <br /> equipment and a 10'x 10' area for its generator. <br /> 24. As part of the Lease Agreement, Blue Sky will allow the Town of Mashpee to locate its EMS <br /> antennas free of charge at 100' aboveground level. <br /> 25. Verizon Wireless and T-Mobile have significant gaps in wireless service in southern portions of <br /> Mashpee. <br /> 26. Without the development of.the Proposed Site, Verizon Wireless and T-Mobile cannot provide <br /> reliable service to the southern portions of Mashpee. <br /> 27. As shown on the Zoning Drawings,the tower meets all fall zone and set back requirements of <br /> the Cape Cod Commission("Commission") and under the Town of Maslrpee's Bylaws, <br /> 28. Visibility of the Proposed Site from neighboring areas will be mitigated to the greatest extent <br /> possible, utilizing a monopole-type tower which maintains a narrow profile and will be <br /> manufactured in silver/gray to blend with the sky. <br /> 29. The FAA determined that no lighting will be necessary for the Proposed Site. <br /> 4 <br />