My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/04/2019 PLANNING BOARD Minutes
>
12/04/2019 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 9:50:00 AM
Creation date
10/26/2020 3:07:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
12/04/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Case 1:19-cv-12333 Document 1 Filed 11/13/19 Page 9 of 21 <br /> 70. Once it was determined that there are no tall existing structures available within the area,Blue Sky <br /> reviewed suitable raw land sites on which to plade a personal wireless service facility to remedy <br /> the Coverage Gap and capacity needs. <br /> 71. After its initial analysis, approximately twenty-five potentially viable sites remained and each site <br /> was extensively reviewed as a potential alternative and subsequently dismissed for reasons such as <br /> access issues, restrictive covenants, unavailability for lease or sale,parcel size, wetlands, lacking <br /> adequate screening. <br /> 72. Many of these sites would also have a greater impact on neighboring residences. <br /> 73. After a thorough analysis of all existing structures and raw land; the Applicant identified the <br /> proposed site,the Town's preferred location for a new wireless facility,as the only feasible location <br /> to close this significant Coverage Gap for Verizon Wireless and T-Mobile while satisfying setback <br /> requirements and other requirements of the Town's Bylaws and Commission regulations. <br /> 74. Blue Sky, Verizon Wireless and T-Mobile then determined, and the Cape Cod Commission and <br /> the Mashpee Zoning Board of Appeals agreed,that the proposed tower was in the only location and <br /> the minimal height,necessary to remedy the Coverage Gap and capacity issues in southern <br /> Mashpee. <br /> 75. The Board did not propose a single viable alternative or identify any manner in which Blue Sky's <br /> search was flawed. <br /> 76. Members of the public proposed several alternatives which Blue Sky reviewed. <br /> 77. Blue Sky provided definitive reasons why each site raised by a member of the public was not a <br /> viable alternative. <br /> Proceedings before the Cape Cod Commission <br /> 78. The Proposed Site is located in the R-3 Zoning District. Pursuant to the Town of Mashpee Zoning <br /> Ordinance,§174-25(H)(9),a personal wireless service facility is allowed in the R-3 Zoning District <br /> by special permit from the Planning Board. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.