Laserfiche WebLink
Case 1:19-cv-12333 Document 1 Filed 11/13/19 Page 10 of 21 <br /> 79, On May 04,2018,Blue Sky filed an application for a special permit for a Personal Wireless Service <br /> Facility with the Mashpee Planning Board. <br /> 80. The project qualifies as a mandatory Development of Regional Impact ("DRI") under Section <br /> 3(i)(1)of the Cape Cod Commission's Enabling Regulations. <br /> 81. After a detailed technical review process with the Commission, the Commission approved the <br /> Proposed Site on October 18,2018. <br /> 82. The DRI hearing period for the project was opened by a Commission hearing officer on August <br /> 20,2018. <br /> 83, A Commission subcommittee held public hearings on the project on'September 5,2018 at the <br /> Mashpee Public Library and on September 17,2018 at Commission offices. <br /> 84. Commission staff prepared a staff report,dated August 29,2018,for the September 5,2018 <br /> hearing. <br /> 85. The subcommittee met on October.9,2018 at Commission offices to review the draft DRI <br /> decision and after review,voted to recommend that the Commission approve the project subject <br /> to the conditions in said decision. <br /> 86. The Rill Commission held a hearing on the project October 18,2018 where it considered the <br /> subcommittee's recommendations,including the draft written DRI decision for the Project and <br /> approved the Proposed Site. <br /> 87, The Town Manager,Fire Chief,and other Town public safety and other officials provided <br /> oral testimony to the Commission about the long-standing identified need for better wireless <br /> coverage for 911 calls in the southern portion of Mashpee,and the Proposed Site's ability to <br /> provide for.wireless coverage more generally in south Mashpee;,how this identified need led <br /> to the Town's issuance of an RFP for wireless facilities at the Proposed Site, and how <br /> reliable coverage is critical to the provision of emergency services in south Mashpee. <br /> 10 <br />