Laserfiche WebLink
energy sytemr doen_ot trtggez dateZa Revaev orz zts�w lo �ver, herchsytms ale <br /> iztcludod as past of a larger development proposctthat�ega�zrezte1'an Reyzew,the- F <br /> �munzcalzty has the oppartunzty to revzety the row mounted oz smallcarc ground rytounted =_ <br /> solar energy systems as part ofe Zargez p2_5 IT <br /> roposal <br /> E <br /> 1s dasussed earlier zrt this documentivhzl reguralrg aesth zc�s�caf aral� be considered u <br /> mattex;of protectzng�u�lzc we�jre, attemptatig to puce z estractcons on solar enez gy system as <br /> they�eate�to aesthetzcs cancreate roadbloef�s to c�ctuat znstallatto It r therefore dots <br /> recommended_th conzmunztte regalate aest7zetzes_afol <br /> atctr energysters, oar thatthey doo <br /> every cazztzously, due to the sit ong statutoryrotectzons xn Chdpte40Aeclaon Hoyueve><, <br /> where commuz2ztzes already have,Site Plun;Revzew sta�zdat ds that relate to aesTi�ttcs,such as <br /> screeningrequzrements, tliesetandards should also apZy to solar energy systems Tn other <br /> words,~solar energy sysna �iouTd notbe szxzed outlan-wid re'gutctedoe strzngent�y than other <br /> �ses th�trequire�ite,�tarz` �uzew;liowever�Q t7iey Harz befzeld�o s�ari2e��v�o�e trzGtzons <br /> that are zn Za'ce or other ups �- � � , <br /> Example 1 (Site Plan Review provisions for medium-scale ground-mounted solar energy systems <br /> in residential zoning`districts): <br /> 1.0 Site Plan Review <br /> 1.1 Applicability <br /> 1.1.1 Medium-scale ground-mounted solar energy systems proposed within <br /> residential zoning districts shall undergo Site Plan Review prior to <br /> construction,installation or modification as provided in.this section. <br /> 1.2 Site Plan Document Requirements <br /> Pursuant to the Site Plan Review process,,the,project proponent shall provide the <br /> following documents,as deemed applicable by the Site Plan Review Authority: <br /> 1.2.1 A site plan showing: <br /> (a) Property lines and physical features,including roads,for the <br /> project site; <br /> (b) Proposed changes to the landscape of the site;grading, <br /> vegetation clearing and planting,exterior lighting,screening <br /> vegetation or structures; <br /> (c) Blueprints or drawings of the solar energy system showing the <br /> proposed layout of the system,.any potential.shading from <br /> nearby structures,the distance between the proposed solar <br /> collector and all property lines and.existing on-site buildings <br /> and structures, and the tallest finished height of the solar <br /> collector; <br /> - 11 - <br />