Laserfiche WebLink
(d) Documentation of the major system components to be used, <br /> includingthe panels,mounting system,and inverter; <br /> (e) Name,address,and contact information for proposed system' <br /> installer; <br /> (f),Name,address,phone number and signature of the project <br /> proponent,as well as alf co-proponents or property owners,if <br /> any; <br /> (g).The name,contact information and signature of any agents <br /> representing the project`proponent; and <br /> (h) Zoning district designation for the parcel(s)of land comprising - <br /> the project site., <br /> Ijthe follattzg are frotdessed to exkrtzng szteZgneureSu <br /> eglaions tlzetMIN <br /> Z the cozznzuntly mcry wish to znztle them <br /> i z Locatz_o s o,active czrmland and z ime aYmland�sotls, <br /> ��V n f_ <br /> Ok <br /> 'wetlanclr,pe>mazientZyprptecled oienspace,Przortty <br /> =_Habitat Areas and Biolap Gntzcal Nau al Lancsetzp�= <br /> ��relabttatznappecl by tie Natural Heritage& a <br /> Endal�gcrel��ectes I'z ogra_m CYSP)and `Yrnpoz�tant T <br /> Wildlife by Habitat"mapped Zhe IDEP = - <br /> ��,_Locatons��flQodpl�izns or inundation ar?ea�jar moderate-�' <br /> or hz�h7zazaz�d dams; � � - � . <br /> Locations o �Zocal af=Natzanal Histozzc D,istrtcts, �` �_ <br /> 1.2.2 Proof that the project proponent will meet the required Site Plan Review, <br /> notification procedures. <br /> �Comznezztazy Provision 12 Z ave bo should reference the mttnrctpaltty's extsttjzg-,Ste Pla�z <br /> Revzeivpztblic and/or-abutter notzjTicattonpt*ocedures-zf applzcable For exanzpTe a�comrnun�ty <br /> may re�zazre prolects-=that az'e su�bfeet-to x5z�Plan Revzew to notzfy all property ovtzers�utthzrz <br /> 1.3 Site Plan Review Design Standards <br /> 1.3.1 Standards for medium-scale ground-mounted solar energy systems <br /> proposed within residential zoning districts <br /> 1.3.1.1 Utility Notification-No grid-intertie photovoltaic system shall be <br /> installed'until evidence has been given to the Site Plan Review <br /> Authority that the owner'has submitted notification to the utility <br /> company of the customer's intent to install an interconnected <br /> customer-owned generator. Off-grid systems are exempt from this <br /> requirdrient. <br /> - 12- <br />