Laserfiche WebLink
28 <br />Report of the Highway Surveyor <br />To the Honorable Board of Selectmen <br />and the Citizens of the Town of Mashpee <br />I hereby submit my Annual Report as Highway Sur- <br />veyor for the year ending December 31, 1962. <br />Chapter 90 Construction work on Cotuit Road 2984 ft. <br />26 with 3 -inch mix and in places there is still a little more <br />shoulder work to complete the job. <br />Chapter 81 Lovells Lane, Orchard Road, Mashpee Neck <br />Road, Asher's Path, Nimgret Avenue, Colling Lane, were all <br />seal coated with asphalt. <br />Old Brick Yard Road penetrate seal; all other Roads were <br />patched and had general maintenance whenever needed. <br />Highway General money was spent for brushing and on <br />ways and to supplement Chapter 81. <br />Chapter 90 Maintenance money was spent for purchasing <br />three-eighths blue stone for Route 130 and Route 151 and <br />fill cracks on Route 130. <br />Snow and Ice appropriation was used for plowing and <br />much sanding. We are in very much need of an automatic <br />sander. <br />In closing, I wish to thank the Selectmen, Town AccOunt- <br />ant, State Engineers and all other departments for their <br />cooperation with me in carrying out my work. <br />Respectfully submitted, <br />EDWIN L. WHITE, <br />Highway Surveyor <br />