Laserfiche WebLink
103 <br /> base course to, a section of Great Neck Road..from station <br /> forty to station ninety-five, consisting of approximately 5,500 <br /> linear feet. This construction was completed under the <br /> direction of State Aid Engineers, from District Seven Massa- <br /> chusetts Department of Public Works. Our ultimate goal is <br /> to complete the construction of Great Neck Road from Red <br /> Brook Road to station forty this year. <br /> Under Chapter 497 we were able to complete a number <br /> of drainage problems on South Sandwich and Cotuit Road; <br /> which were major projects. We also replaced drains and <br /> berms along Great.Neck Road.and Route.151. Fill and drain- <br /> age was also applied to Seconsett Island Causeway. A mix in <br /> place asphalt was applied to Monomoscoy Causeway. We <br /> are running into a maintenance problem on Great Oak Road <br /> which we intend .to correct this Spring. <br /> Chapter 81 <br /> The following maintenance was performed on various <br /> streets, roads and lanes throughout the Town under a State <br /> Aid Program: <br /> Forestdale $450.00 <br /> Falmouth 275.00 <br /> Lavell Lane 250.00 <br /> Quashnet 300.00 <br /> Old Barnstable 350.00 <br /> Old Mill 1,835.00 <br /> Pimlico Pond 300.00 <br /> Cotuit #1 2,045.00 <br /> South Sandwich 2,620.00 <br /> Lowell 200.00 <br /> Meetinghouse 200.00 <br /> Great Neck 350.00 <br /> Red Brook 200.00 <br /> Waquoit 275.00 <br /> Orchard 275.00 <br /> Monomoscoy 200.00 <br /> Mashpee Neck 2,070.00 <br /> Ninigret 225.00 <br /> Central 200.00 <br /> Cotuit #2 250.00 <br /> Great Oak 350.00 <br /> Degrasse 105.00 <br /> Riverside 370.00 <br />