|
----------- -----
<br /> --_ - - --- -- -- -
<br /> i
<br /> i
<br /> TOW1d 00.MJYBHPISE
<br /> AMTo'Building gods'
<br /> Artigie Tp see 'it;moi Powe will r fliaRldm fR
<br /> v¢fje <to mend, The By Laws_of. the �A pie �o �f tits
<br /> Town .eq is;M1aehke Artlerg iV,"'Building vd{e�40a ToW1j'•, �!t eWs;
<br /> Code,`by deleting-therefrom Sodi6nlo, Whoever remains a d: or,.street
<br /> Para 1,,and. by inserting therein the or, elsewhere' in the TO of Mashpee P
<br /> following: - and 4ccoits,or addresses anothee.perso ;
<br /> Para' t Fees for permits under this with profane or obscene language, rrlay`.
<br /> code shall be paid to the Tmyn of be arrested by a t0611ce officer with
<br /> Mashpee in accordance with the.following a warrant-If performetl in"the offreB ; 1
<br /> schedule: presence and if unknown to sucf►xoffieer
<br /> 1. .For all buildings and structures, kept fn custody unfit he can," Pfakan.
<br /> with- estimated cost not exceeding, before the"court (having jut sediettop',:
<br /> $5,000.00 The fee will be 55.00; and Any person violating;this liy taw shall'
<br /> $1.00 additional' for each $7,000.00 of be-punished-dn an amount not�xoeeding{ ,'
<br /> estimated cost above$5,000.00. ' $50.00 for each offense:
<br /> 2. For all other alterations and repairs Acttonr Motion duly made and-scondedj,
<br /> with estimated cost not exceeding that Article) 18 be-accepted as trees(, ,
<br /> $5,000.00, the fee will be y$5.00 with A vote.
<br /> $1.00 :addlTional. for each $1A00.00 of Boston,Mass. June�11 jgyl: b .
<br /> estimated cost above$5,000.00. The foregoing amendment tq. generelt
<br /> 3. For elevator, installation: $10.00 for by-lawsadopted under Article 18
<br /> each shaft.
<br /> 4.-No fees shall be required to be
<br /> paid for. any permit-under this code. 7. ` r
<br /> which are for buildings or for alterations
<br /> or repairs thereof where such'buildings
<br /> are for, or owned by the Federal
<br /> Government or the Commonwealth of
<br /> Massachusetts, the County of Barnstable
<br /> or the Town of Mashpee. Thereford. e �aI
<br /> only a permit and.plan"isorequire
<br /> ESTIMATED. COST OF CONSTRUCTION
<br /> One (1) story structure at $13.00 a,
<br /> square.foot. One and .one half (11/2) '1
<br /> story structure at $17.00.a square foot
<br /> (ForB grade average const) 1
<br /> Two (2) story structure at $20.00
<br /> a square foot.
<br /> "A" Grade + 25 ,percent (Excellent
<br /> Const.) $
<br /> C" Grade - 25 percent (Summer
<br /> Cottage Const.)
<br /> - The estimated_ cost used to compute I
<br /> the Building,-Cost Applicable for new
<br /> construction under the schedule above ,
<br /> shall be arrived at by multiplying,the
<br /> total enclosed,floor area;of the.structure II
<br /> expressed as•square feet above grade ,+
<br /> by: the above set estimated pricesi
<br /> and for alterations reconstruction or
<br /> moving to a h&,fouedati6ii the'"4fela
<br /> shall:be based on thaestlmated> cost's
<br /> by,they persoh,!#po,yingr of the iteritii'
<br /> but ,in, no ase�shaii";a peFmit f 3'
<br /> It-
<br /> work be issued, for a',`flee lgss
<br /> $5.00. v
<br /> Boston,Masstrfr '* .
<br /> -The foregoing,amendment to building i'
<br /> code adopted under Article 46 js, proyed�
<br /> , e.kR+Quunt.
<br /> r j i
<br /> Berntee,j_yfa' F
<br /> i
<br /> l iu:
<br /> l i
<br /> 1 .
<br /> i
<br /> . r
<br />
|