Laserfiche WebLink
29 <br /> Report of the Highway Surveyor <br /> To the honorable Board of Selectmen <br /> and Citizens of the Town of Mashpee <br /> I herewith submit my annual report as Highway Sur- <br /> veyor for the year ending December 31, 1955. The usual <br /> maintenance work was accomplished. Most of the work was <br /> done by a Sand Spreader which was purchased in Sept. 1955. <br /> The following roads were able to have sections of them <br /> surface treated under Chapter 81 contract: Lovell Lane, <br /> Quashnet, Pimlico Pond, Wakeby, Cotuit, South Sandwich, <br /> Meeting House, Cemetery, Popponesset, Lake Avenue, Newton <br /> and Orchard. <br /> Highway General Money was used to supplement Chapter <br /> 81. The Town needs a New Motor Grader. <br /> Under the Chap. 90 maintenance contract, 4,000 feet of <br /> Red Brook Road was surface treated starting at the Fal- <br /> mouth line. <br /> Guard rails were painted on Red Brook Road and Route <br /> 151 in addition to brushing under the same contract. <br /> Under the Chapter 90 construction contract, work was <br /> continued on Great Neck Road with 3,850 feet being graded, <br /> hardened and a base course of road-mix surfacing applied. <br /> It is hoped that the 1956 work on this road may be begun early <br /> enough so as to be completed before the summer traffic starts. <br /> I desire to express my appreciation to the town officials <br /> and citizens for the co-operation given me in performing <br /> the duties at my office. <br /> J <br />