Laserfiche WebLink
30 <br /> The following is a summary showing the expenditures <br /> made on the various roads under the Chapter 81 contract. <br /> Forestable (Rt. 130) $391.00 <br /> Ashumet 4.00 <br /> Falmouth 46.90 <br /> Lovell Lane 382.99 <br /> Quashnet 495.24 <br /> Old Barnstable 424.00 <br /> Old Mill 525.00 <br /> Pimlico Pond 695.70 <br /> Peters Pond t29.00 <br /> Wakeby 460.92 <br /> Cotuit 848.99 <br /> South Sandwich 680.88 <br /> Lowell 77.50 <br /> Hatchville 18.00 <br /> Meeting House 2,172.07 <br /> Cemetery 79.00 <br /> Collins Lane 20.55 <br /> Great Neck 432.40 <br /> Popponesset 554.10 <br /> Red Brook 94.90 <br /> Lake Avenue 159.66 <br /> Seaconset 3.50 <br /> Newtown 242.18 <br /> Route 151 (Waquoit Cut-off) 153.00 <br /> Orchard 685.52 <br /> $9,750.00 <br /> Respectfully submitted, <br /> EDWIN L. WHITE, <br /> Highway Surveyor <br />