My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1958-Annual Town Report
>
1958-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 3:18:34 PM
Creation date
2/19/2021 3:18:34 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
1958
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
27 <br /> Report of the Harbor Master <br /> To the Honorable Board of Selectmen: <br /> The entrance to Waquoit Bay, and Little River was <br /> dredged during the summer of 1958. The channel enters from <br /> Waquoit Bay-and is one hundred feet wide up to the vicinity <br /> of Warren's Point. It then proceeds up Little River for ap- <br /> proximately one half mile with a width of sixty feet. The <br /> water depth is approximately four feet at mean low water. <br /> Four large Navy mooring buoys were obtained to mark <br /> the Waquoit Bay end and smaller buoys were purchased for <br /> the Little River section. A set of spar buoys have been made <br /> for winter use. All buoys have reflectors for better night <br /> visibility. <br /> To prevent damage to markers only a few were placed <br /> during the past season as the dredge equipment was not re- <br /> moved until fall. <br /> A spar buoy was placed approximately one hundred feet <br /> south of Popponesset Rock. <br /> Respectfully submitted, <br /> JOHN A. MOORE, <br /> Harbor Master <br />
The URL can be used to link to this page
Your browser does not support the video tag.