Laserfiche WebLink
there is no firm estimate of gross leasable floor area, line of a lot than the minimum requirements of the <br /> estimated area shall be calculated based on twice the underlying zoning district. However, in no case may <br /> maximum lot coverage allowed for the project." one or two-story primary structures be located less <br /> Add the following new paragraphs to Subsection H: than twenty (20) feet from each other or may struc- <br /> tures containing more than two (2) stories be located <br /> "The Planning Board may require that a schedule of less than thirty (30) feet from any other habitable <br /> architectural, signage and/or landscaping controls be structure except in conformance with any applicable 1 <br /> adopted for the development, enforceable by the state and local building and fire codes or regulations. <br /> Town's special permit authority as well as deed As part of its project review, the Planning Board will <br /> restrictions on the development and any lots to be sold, request a written recommendation from the Fire <br /> in lieu of specific building, signage and landscape Department and Building Inspector regarding struc- <br /> designs for all portions of the project. Such controls tures proposed to be set back from each other by less <br /> shall have the effect of promoting design that is in than the above required distances. <br /> keeping with the character of the Town and of Cape <br /> CodMaximum lot coverage with buildings shall be as <br /> allowed for the applicable zoning district. This area <br /> Any proposed schedule of architectural, signage and may be calculated in one of two ways: either on an <br /> landscaping controls shall require review by the individual lot basis for each lot created within the <br /> Design Review Committee and their report to the development, or as an overall average for the develop- <br /> Planning Board prior to approval of the special permit ment. In the latter case, total area of lot coverage by <br /> application for the development. buildings shall be calculated for the project and speci- <br /> If such a schedule of architectural, signage and / or fied in the special permit decision. The applicant shall <br /> landscaping controls is required,it shall be recorded as devise a method by which building coverage area may <br /> a deed restriction on the property at the same time as be allocated to each lot and said method shall require <br /> the special permit is recorded and the Planning Board the approval of the Planning Board as part of its spe- <br /> shall be provided forthwith a copy of the recorded cial permit decision. In addition, the provisions of <br /> documents indicating the registry book and page at Section 174-80.H. regarding impervious surface cov- <br /> which each is recorded." erage within Groundwater Protection Districts shall <br /> apply. <br /> Add new Subsections I and J as follows: In addition to the provisions of its special permit, the <br /> "I. Within any commercial center located on a parcel Planning Board shall require that the applicant estab- <br /> of land greater than 200,000 square feet in the C-1, C- lish deed restrictions or other legal mechanisms to <br /> 1-0 or C-1-SV districts, the Planning Board may ensure that the dimensional or other provisions of the <br /> approve subdivision lots of any size pursuant to the special permit are adhered to by subsequent lot owners <br /> provisions of the special permit issued for said center, within the development. <br /> provided that each lot shall have at least 20 feet of J. In addition to any other application materials <br /> frontage on a street approved by the Board under the required for special permits, applications for <br /> subdivision control law or on a Town or State high- <br /> way. However, no lot may be created which does not Commercial Centers shall include: <br /> meet the minimum lot area and frontage requirements A calculation of maximum allowed lot coverage with <br /> of the zoning district unless said lot is serviced by a buildings, in square feet, and a discussion of the pro- <br /> public or private wastewater treatment plant approved posed method of allocating building coverage area to <br /> by the Planning Board under the center's special per- any proposed or future lots. If the development lies <br /> mit. No building permit may be issued for a building wholly or partly in a groundwater protection district, <br /> on said lots unless the required wastewater plant has the requirements of Article XIII shall also be <br /> been completed and has received all required state and addressed. <br /> local permits. A plan of the proposed parking facilities, including <br /> Within any commercial center located in the C-1,C-1- proposed parking space layout, drainage, lighting, <br /> 0 or C-1-SV districts, the Planning Board, as part of landscaping and bicycle racks or similar facilities and <br /> its approval of the special permit for said center, may a description of the proposed means of ownership, <br /> approve a specific schedule of dimensional controls, construction, operation and maintenance of such facil- <br /> including setbacks, required buffer areas, frontage and ities, including copies of any proposed deeds, deed <br /> lot size,but not including height or overall commercial restrictions, association bylaws or other legal docu- <br /> center lot coverage, which differs from that required in ments or mechanisms required. In addition, the appli- <br /> the underlying zoning district. Unless such a schedule cant shall provide his calculations of the number of <br /> is adopted, no structure within a commercial center required off-street parking spaces and a description of <br /> may be built closer to the street line, side line or rear any additional on-street parking proposed. <br /> 69 <br />