Laserfiche WebLink
I <br /> 1 Assist in any strategic planning for <br /> Geographical Information Systems. Report of the <br /> • Mature the Geo/TMS Permitting application Sewer Commission <br /> by implementing in Licensing, Conservation, <br /> Zoning and Planning departments. To the Honorable Board of Selectmen <br /> • Continued support for Lucent Legend and the Citizens of the Town of Mashpee: <br /> Intuity/Audix programming and maintenance <br /> functions. As we have noted in the past, existing loading of <br /> Evaluate Windows XP operating system and nitrogen to the watersheds of the Mashpee River, <br /> • Office XP desktop applications. Shoestring Bay,Waquoit Bay and other coastal waters <br /> has exceeded the capacity of those waters to deal with <br /> • Implement new inventory/help desk software. it, resulting in the loss of our eelgrass beds and the <br /> shellfish resources that depended on them, as well as <br /> Three Year Plan and Outlook: in fish and shellfish kills due to low oxygen levels, <br /> • Determine how the four primary IS functions— "pea soup" water and increasingly foul odors. These <br /> networks and technical support, desktop sup- conditions have continued to get worse as the town has <br /> port, application development and, and GIS become more developed. <br /> development and support—will be provided. <br /> The Commission is working toward developing <br /> • Move all town employees to one e-mail <br /> server, eliminating the need for server desig- a solution to the Town's wastewater and nitrogen load- <br /> server, <br /> oad- <br /> ing problems with the assistance of the firm of Stearns <br /> nation and simplifying e-mail addresses. <br /> &Wheler, along with Dr. Brian Howes of the UMass- <br /> • Mature intemet usage: With the right equip- Dartmouth School of Marine Science &Technology. <br /> ment, citizens could pay bills, stickers, fines <br /> and fees via the internet. We will perform an Having been successful in qualifying for a <br /> assessment to see if the need is there. $405,140 zero interest loan from the Commonwealth <br /> Develop world wide web site content and to develop our plan, we finally received a loan com- <br /> • ways to provide community access to "pub- mitment from the state and have begun work on a <br /> information. Watershed Nitrogen Management Plan l Effluent <br /> hshed" informat Pipeline Preliminary Design, which is intended to <br /> • Mature the WAN Plan linking Municipal identify the most cost-effective approach to reducing <br /> Buildings with Library, Senior Center, nitrogen in each watershed to levels that do not harm <br /> Human Resources and Historical the bays. <br /> Commission. <br /> Examine video conferencing. The first step in the process was the preparation <br /> • of an Environmental Notification Form (ENF), which <br /> • Manage technical obsolescence to avoid was submitted to the state and for public comment in <br /> costly replacement. late September. The ENF process provided state <br /> Maintain technology awareness for operating agency and public input regarding the scope of our <br /> • systems, applications and web project. On November 9, the Secretary of <br /> Environmental Affairs issued his Certificate on our <br /> Respectfully submitted, project and specified a number of tasks we will be <br /> required to complete to conform with state environ- <br /> Steven Buss mental regulations. At year's end, our consultant was <br /> in the process of preparing scope revisions and a <br /> response to the issues raised in the ENF comment <br /> process. <br /> To assist with our project, the Planning <br /> I <br /> Department prepared a"buildout"analysis of potential <br /> development on every parcel in the town. This infor- <br /> mation is being incorporated by staff from the Cape <br /> Cod Commission into nitrogen loading projections for <br /> the watersheds of each of Mashpee's coastal embay- <br /> ments,which will then be input to computerized nitro- ' <br /> ,a <br /> 115 `` <br />