Laserfiche WebLink
Commission's consultant engineers, Bill Fisher and <br /> Dave Andrews of the URS Corporation, who were <br /> intensely involved with both the design and monitor- <br /> ing of the work: Also intrinsically involved was <br /> Assistant Town Administrator, Jim Marr; we thank <br /> ,. him for his responsiveness and diligence. <br /> 2003 also saw the rebuilding of the treatment <br /> s plant for the FS-1 EDB Plume at the Quashnet bogs. <br /> su.. <br /> 1 The plant had burned down in October of 2002. In <br /> addition to being rebuilt, the treatment infrastructure <br /> was expanded and improved. Erosion problems in the <br /> For the upcoming year, some of our major actio- construction area in the areas adjacent to the plant <br /> ities will be to continue to be involved with MUy Fere effectively addressed. The Commission would <br /> NIS b <br /> t like to thank Lisa Strock of Jacobs Engineering for her <br /> converting the vacation and sick leave records.We will <br /> r effective training opportunities for coordination of these efforts to remediate construction <br /> continue to provide e <br /> employees, to work closely with the Affirmative <br /> impacts. <br /> I Action Committee on "No Place for Hate" activities, This past summer (in June) saw the worst algal <br /> y to continue to be more involved with Benefits bloom seen to date in Waquoit Bay and Little River. <br /> r Management, continue to computerize department The magnitude of the bloom was worse than experi- <br /> e records, continue to take a leadership role in updating enced in the past. Unfortunately, a repetition is likely, <br /> I work rules, policies, as well as continuing to be a and the situation will likely worsen as even greater <br /> e resource for all municipal town employees. I look for concentrations of nitrates enter the Bay. A complete <br /> r ward to the many new challenges ahead. description of the causes and effects of our I' <br /> s Nitrate/eutrophication problems is beyond the scope !' <br /> I Respectfully submitted, <br /> of this report. Suffice it to say, this is a human-cause <br /> Marilyn Farren problem, as too much nitrate acts as a "fertilizer", <br /> Personnel Administrator stimulating excessive growth of macro algae. Nutrient <br /> loading (nitrate-nitrogen)has been extensively studied <br /> h and it is well documented that it is primarily caused by <br /> septic stems, landscape fertilization practices and to <br /> Report of the P Y P <br />,t a lesser extent road runoff. These nitrate loads <br /> Conservation Commission <br /> t emanate from many square miles of the contributing <br /> watershed. The bloom, which lasted into July, was I' <br /> i <br /> To the Honorable Board of Selectmen most noticeable on the Seconsett Island side of <br /> Waquoit Bay,but floating algae was also noted for the <br /> e and the Citizens of the Town of Mashpee first time in Little River. Dead and dying algal mats <br />_ were washed ashore; on Seconesett Island, odorous j <br /> In October of 2003, Vice-Chairman Elliot <br /> Iles were as much as 15 inches high and extended <br /> n Rosenberg left the Commission. Elliot's contributions over 100 yards into Waquoit Bay proper. Recently, j <br /> d as an officer and very active member spanned two (December 23, 2003) there was another significant <br /> terms and three decades. Being an attorney, the <br /> e <br /> Commission relied on him for legal expertisebloom in the same area. Therefore,itis almost aguar- 1' <br /> y , but his antee that spring and summer will bring the same <br />.s common sense and ability to sort out complex issues result. <br /> were also irreplaceable contributions. He will be sore- <br /> ly missed. <br />�1 The algal bloom problems include health and <br /> y, safety (slip and falls and decaying sea life odor), dis- j <br /> is After many years of planning, the Commission posal (currently not allowed at the dump), shellfish <br /> is was finally able to complete the re-construction of the habitat compromised, and management of recurring <br /> Quashnet River/Johns Pond water-control structure blooms. The Mashpee Conservation Commission was <br /> and fish ladder. Despite a few early, anxious moments one of the first in the State to enact local nitrogen-load <br /> l with spring-water seeps collapsing the excavated area standards,but these regulations can only slow down an t <br /> r- adjacent to the Pond, the contractor, Jeff Vaughn of ever-worsening problem. No meaningful mitigation to <br /> Marine Tech,overcame these difficulties and complet- <br /> g this serious problem can be realized without awater- <br /> ee ed the project on time, within budget and with quality shed-wide approach, one that will neither be inexpen- <br /> workmanshi Special credit should also o to the t <br /> P• P g sive nor easy <br /> s <br /> 127 <br />