My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-Annual Town Report
>
2007-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:19:45 PM
Creation date
2/19/2021 4:19:45 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(4) Complaints. Upon written notifi- posed mitigation that the WECF <br /> cation of a complaint detailing minimizes any impact on the <br /> non-compliance with the terms of visual character of surrounding <br /> the special permit or the require- neighborhoods and the commu- <br /> ments of this chapter, the nity. This may include, but not be <br /> Building Inspector or his limited to, information regarding <br /> designee shall record the filing of site selection, turbine design, <br /> such complaint and shall buffering and lighting. All electri- <br /> promptly investigate the com- cal conduits shall be under- <br /> plaint. If the Building Inspector ground. <br /> determines that the WECF is not <br /> in compliance, the owner of the (2) Color. WECFs shall be of non- <br /> property shall be notified in writ- reflective muted colors that blend <br /> ing to correct the violation. If the with the sky, without graphics or <br /> violation is not remedied within other decoration. A single color <br /> 30 days from the date of notifica- shall be used on the blades and a <br /> tion, the Building Inspector may single color on the tower. <br /> require the WECF be rendered <br /> inactive and shall remain so until (3) Equipment Shelters. All equip- <br /> such time as the Building ment necessary for monitoring <br /> Inspector determines the WECF and operation of the WECF shall <br /> is in compliance. be contained within the turbine <br /> tower. If this is infeasible, at the <br /> If, upon investigation of said discretion of the SPGA, ancillary <br /> complaint, the Building Inspector equipment may be located outside <br /> determines that the WECF is the tower, provided it is either <br /> operating in compliance with the contained within an underground <br /> special permit and the require- vault or enclosed within a struc- <br /> ments of this chapter, notice in ture or behind a year-round land- <br /> writing shall be provided to the scape or vegetated buffer. <br /> person who has filed such com- <br /> plaint and to the owner of the (4) Lighting and Signage. <br /> property stating that no further <br /> action is required, all within 30 (a) Wind turbines shall be lighted <br /> days of the receipt of the written only if required by the <br /> notification of complaint. Any Federal Aviation <br /> person aggrieved by the Building Administration (FAA). The <br /> Inspector's decision may appeal applicant shall provide a copy <br /> such decision to the SPGA. of the FAA's determination to <br /> establish the required mark- <br /> (5) Professional consulting fees. The ings and/or lights for the <br /> SPGA may retain a technical structure. <br /> expert / consultant to review and <br /> verify information submitted by (b) Lighting of equipment, struc- <br /> the applicant. The cost for such a tures and any other facilities <br /> technical expert/ consultant shall on site (including lighting <br /> be at the expense of the applicant. required by the FAA, if possi- <br /> ble) shall be shielded from <br /> F. Design Standards abutting properties. <br /> (1) Visual Impact. The applicant (c) No signage allowed. <br /> shall demonstrate through project <br /> siting, facility design and pro- <br /> 93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.