Laserfiche WebLink
(5) Guy Wires. Guy wires utilized in H. Safety Standards. <br /> the construction of any tower <br /> shall be left totally unadorned. (1) No hazardous materials or waste <br /> Nothing shall be hung from or shall be discharged on the site of <br /> attached to said wires,except that, any WECF. If any hazardous <br /> in order to prevent unintended materials or wastes are to be used <br /> contact by persons who may be on site, there shall be provisions <br /> on the site, they may be wrapped for full containment of such mate, <br /> with a colored sleeve only, which rials or waste. The provisions of <br /> shall extend to a height not Article XIII regarding <br /> greater than 10 feet above grade. Groundwater Protection Districts <br /> shall apply. <br /> (6) Telecommunications. WECFs <br /> may include telecommunication (2) Climbing access to any tower <br /> antennas, provided they comply shall be limited by placing climb. <br /> with Section 174-45.3 of the zon- ing apparatus no lower than ten <br /> ing by-law. Joint special permit (10) feet from the ground. <br /> applications may be filed under <br /> the provisions of this Section and (3) Clear Area, as defined in <br /> 'i Section 174-45.3. In such case, Subsection 174-45.5-B., shall be <br /> the proposed telecommunications no less than ten (10) feet. <br /> carrier shall be named as a co- <br /> applicant. (4) The wind turbine shall conform to <br /> FAA Safety Standards, as <br /> G. Environmental Standards. amended. <br /> (1) Sound. The WECF and associ- I. Condemnation <br /> ! ated equipment shall not generate <br /> sound in excess of ten (10) deci- (1) Upon a finding by the Building <br /> bels (DB) above ambient sound Inspector that the WECF has been <br /> level at the property line. In order abandoned or has been left in dis- <br /> to demonstrate compliance with repair or has not been maintained <br /> these sound standards, the appli- in accordance with the approved <br /> cant shall provide to the SPGA,as maintenance plan, the owner of <br /> part of the special permit applica- said WECF shall be notified in <br /> ! r' <br /> tion, an analysis which is consis- writing by certified mail that the <br /> tent with Massachusetts WECF shall be brought up to <br /> Department of Environmental standard. If required repairs or <br /> Protection guidance for sound maintenance are not accona- <br /> ! measurement. phshed within 45 days of <br /> the date <br /> of said notification, the WECF <br /> (2) Shadow/Flicker Impact. WECFs shall be deemed condemned and <br /> shall be sited in a manner that shall be removed from the site <br /> does not result in significant shad- within 90 days thereafter. The <br /> owing or flicker impact. The aforementioned periods of time <br /> applicant has the burden of prov- may be extended at the request of <br /> ing that this effect does not have the owner and at the discretion of <br /> significant adverse impact on the Building Inspector."Removed <br /> neighboring or adjacent uses from site" shall mean: <br /> either through shadow/flicker <br /> modeling and/or siting and/or (a) Removal of the wind turbine <br /> landscaping mitigation. and tower, all machinery, <br /> P g g <br /> el <br /> equipment, equipment sh <br /> 94 <br />