My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/11/2019 ZONING BOARD OF APPEALS Minutes
>
12/11/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2021 5:00:54 PM
Creation date
10/29/2021 3:28:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
12/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A MODIFICATION OF (V-2018-16) <br /> Owners;Jacques Morin and Martha Morin <br /> 11 Hamblin Road, (Map 120 Parcel 34) <br /> Mashpee, MA 02649 <br /> MOD-2019-61 <br /> Sharon asked if the deck increase would require a Variance for the wetlands. Mr. Morin <br /> said that Drew, Conservation Agent gave him an administrative approval. The Board <br /> reviewed the plan and wanted to confirm the current location of the hot tub, and the lot <br /> coverage percentage. It was determined that it was on the previous site plan that was <br /> approved back in 2018. The revised plan shows depicts the "proposed" dwelling because <br /> the house is still under construction. Charlie said the as-built foundation was approved,but <br /> because there is an extension of the deck, he will request another as-built. <br /> Sharon read the Conservation Department comments into the record. Sharon read the <br /> abutter letter into the record. <br /> In view of the foregoing,the Board determined the Petitioner met the criteria for a Variance <br /> modification of an approved Variance(V-2018-16)issued to Jacque and Martha Morin, 11 <br /> Hamblin Road. The modification actually reduces the lot coverage by locating the hot tub <br /> under the deck, and expanding the deck on the dwelling by exactly 1 ft. 9 inches as shown <br /> on the plan. Upon motion duly made and seconded at the Public Hearings on Wednesday, <br /> December 11, 2019, the Zoning Board of Appeals voted unanimously to issue a <br /> modification of an approved variance with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a <br /> Modification under Mass General Law 40A Section 10. <br /> 2. Site Plan: Septic System Design Plan, Prepared by: Cape & Islands Engineering, <br /> Owner of record: Jacques & Martha Morin, 11 Hamblin Rd, Mashpee, MA. Sheet <br /> No.: 1 of 1,Date: April 9,2018,Drawing File Name: HAMBLIN_11_MORIN_SS, <br /> Drawn by: MC, RLR, Checked by: MC, Date: 11/8/19, Remove Hot Tub and <br /> Extend Deck, Signed by Raul Lizardi-Rivera, Professional Engineer No. 46845, <br /> and Matthew C. Costa: Professional Land Surveyor No. 52282. <br /> 3. Conditioned on all Town Department comments read into the record. <br /> 4. Conditioned on specifically the fact that the hot tub square footage is equal to or <br /> more than the addition to the deck and lot coverage. <br /> 5. The modification actually reduces the lot coverage by locating the hot tub under the <br /> deck and expanding the deck on the dwelling by exactly 1 ft. 9 inches as shown on <br /> the plan. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.