My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/17/2004 PLANNING BOARD Minutes
>
03/17/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:10:47 PM
Creation date
1/19/2022 11:56:29 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/17/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
being made to comply with both the Cape Cod COMMi3sion <br /> (CC and Town of a`shpee conditions <br /> .- <br /> Open Space conveyance to the Townon-servat-ion <br /> Restrictions-.trictions-. over twenty (2-0) -acres are .being conveyed as <br /> open space on Meeting House load, as well .as the bulk of <br /> the golf course ( -acres) of conservation restrictions . <br /> sewer System at Cotui't Bay Condominiums - The pump <br /> station has been constructed, tested and activa-ted. The <br /> majority of housing h-a- been co netted and is functioning, <br /> with the remaining threefu.r to be completed by the end of <br /> this month. <br /> Open Space Bounding at Willowbend - Mr. Besse provided' <br /> a working. plan in order to indicate the location of survey <br /> bounding of various open space parcels comprising t-hat <br /> portion of the golf course, He .made reference to .the s-urvey <br /> contract., indicating the need for contract prop.osal-s . He <br /> requested a consensus -from the Board in order to assist the <br /> engineers for prepa-ration of- a contract form. <br /> The Town Planner informed the Boa-rd that the <br /> Consulting .Engineer has reviewed the information being <br /> presented. <br /> Mr.. Bes-Se 'explained the square shape represents <br /> concrete bounds, orange represents those addition-al bounds <br /> .required by the 'Town Plan-ner- and the: Consulting Eng,ineer., <br /> to, be located at ct' itical -points .and to become a permanent <br /> marker to indicate the open space area. <br /> Mr. Besse stated the- Consulting Enginee-r has suggested <br /> the u-se of re-bar at the circle points- to be Located <br /> -magnetically to be fit with. an embossed "Willowbe.nd" cap <br /> which will be numbered consecutively in order to provide <br /> identification in the field. <br /> Tr. Besse -stated his desire to have a contract and <br /> decision in place by April l't, with a completion -d-ate of <br /> i <br /> early May. <br /> There was some discussion regarding conservat.-ion <br /> restrictions located within the golf 'course It elf., various <br /> wooded areas, Bryant,' s Cove eorridor, and- pond areas . <br /> Those areas out-si.de of the: conservation restrictions allow <br /> for golf .activiti , and- maintenance procedures . <br />
The URL can be used to link to this page
Your browser does not support the video tag.