Laserfiche WebLink
i <br /> The chairman stated the Windchime Point Development <br /> has a huge resa r-sibility to the -environmental health. of <br /> the Town of Ma hp e and to the Mashpee River as well . _slue <br /> suggested treatment, plant issues- be addressed in order to <br /> o.pe rate consistently at maximum eff Iciency. <br /> The Towh .Plana er clarified the m nthly testing is of <br /> the effluent and takes place a-t the plant; with an annual <br /> report of the liver a-s required by the Planning' Board of a <br /> certain number of wells,. <br /> 'The Chairman requested the cont.ihuaytion of Planning <br /> Board notification of the monthly reports; -he Town Planner <br /> suggested the Pla-n-n-ing Board be listed. a--s. a direct copy <br /> from the ,eng-inee-r of said monthly reports . <br /> Mr. O' Malley i.nf 0- rmed the Board of his plan to make <br /> said reports available by e-mail for convenience. <br /> it <br /> 'The Town Planner clarified that the rearing required <br /> is of total -nitrogen rather than a nitrate measure) . <br /> Don Myers asked about a time frame for ma i-ng- required <br /> repairs, etc.. <br /> Mr. hit-e% stated some of t-he replacement pumps a;nd <br /> . v. lights have arrrived, and that the r aj or-ity of repairs <br /> should be crpletd within the next week or so. <br /> Mr. Wh-ite explained the motorized valve actuators are <br /> a long-term item., Wrhi. h will actually switch. the flow. from <br /> side to side. Both of the actuators have been water <br /> damaged beyond repair and need replacement . <br /> t this point the chairman- determined there was no <br /> further Board/Public discussion of this matter. she <br /> thanked everyone- f'o ,attending and encouraged continued <br /> monitoring of the situation . <br /> Wi-ndch ime Point,. Inc. <br /> it <br /> Phase II Signoff <br /> Tine chairman recognize-d Mr. Guinn who requested a ' <br /> sinff of Phase II . ~ <br /> 10 <br />