Laserfiche WebLink
1� <br /> are unable to open their windows and are forced to lire in <br /> air conditioning ---hours a day. <br /> Catherine Walter - Reported that Mr. Murdock of Nstar <br /> has agreed to address the concerns raised regarding the <br /> utility transformers . Large 3 14 foot high rhododendrons have been placed on the sides of the transformer, 2 large <br /> blue spruce trees have been strategically placed at the <br /> back of the transformer. She stated she is extremely <br /> grateful for the placement of these beautiful trees . <br /> r. Murdock has agreed to relocate the small <br /> transformer within the streetsca-pe and to change its <br /> position to vertical. Mr. Bonvie ha-s agreed to relocate <br /> the electrical meter to the side of the building. <br /> She thanked the Planning Board, Mr. Murdock, Mr. <br /> Bonvie, and the ad hoc and landscaping committees for their <br /> as-sistar ce in reaching this compromise. <br /> ' Joseph Di o i - Expressed .concerns regarding code <br /> violations on his property, and dangerous situation with a <br /> retaining gall. He provided pictures showing the condition <br /> of support of his porch . <br /> The Board suggested these issues should be brought t <br /> the attention of the Building Inspector. <br /> Mr. Bonvie acknowledged he is aware of this conce-rn, <br /> and is. addressing. the matter with the Building Inspector. <br /> Lynn Braun - Epres-sed her relief with the fact the <br /> Board is approving/allowing the developer to move forward <br /> with the appropriate checks and balances . She pleaded with <br /> the Board to devise some type of safeguard to insure that <br /> all construction/landscaping is completed in all areas of <br /> the project. <br /> The Town Planner proposed the following language be <br /> included in Condition #I - .,Landscaping shall be completed <br /> as expeditiously as possible..." "Conformance with th-e <br /> • conditions of this decision will be considered by the <br /> Planning hoard in its review of, and decision on, further <br /> revisions of the Final Site Development Plain"., to which the- <br /> Board agreed. <br /> 9 <br />