My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/16/2009 PLANNING BOARD Minutes
>
12/16/2009 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:59:07 PM
Creation date
1/19/2022 3:51:36 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
12/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
East Steeple Street— Land Use Plan and Parking Plan—Potential uses have been <br /> assigned to the plan in order determine the amount of square footage commercial and <br /> residential uses. <br /> North-Market.Street—Context Plan— In relationship to 1lashpee Commons, <br /> municipal buildings, Sandpiper Village, and surrounding buildings. <br /> North Market Street—Illustrative Plan—The pinwheel green has been relocated <br /> and is now in balanced to the center of the neighborhood, rather than being offset. All <br /> the buildings have been removed from the setback. There are potentials for connections <br /> to some of the neighboring properties to the north (Coombs School). <br /> North Market Street—Use Plan—The development softens in terms of its-uses as <br /> it gets closer to the Town Common. <br /> Forth Market Street—Parking Plan. <br /> Mr. Stogy stated the next step will be to provide the Board with advance <br /> preliminary grading plans and advanced stormw ter options. He will also provide the <br /> scope of services from the traffic engineer in preparation ofthe traffic study. <br /> There was general discussion regarding the proposed plans including setbacks, <br /> vegetated buffer areas, and lot lines. <br /> The Chairman noted some public concerns being density, building locations so <br /> close to the street, and three-story buildings at the street lime. fir. Rowley suggested that <br /> the topography would dictate a lot of the building size locations. <br /> Mr. Storrs clarified that every residential unit will self-park on its lot, whether two <br /> spaces for the main house,or three spaces for accessory dwelling units. <br /> The Chairman expressed concern regarding the four buildings located within the <br /> buffer zone along Great Neck Road South. He stated he would not be comfortable <br /> waiving multiple buildings located completely within the buffer, without input and <br /> participation of the community. <br /> It was agreed that discussion in this matter would be continued to the January 20, <br /> 20I0 Planning Board Meeting. <br /> Correspondence <br /> Workshop—Conflict of Interest Law and Ethics <br /> Southport—Incomplete sidewalks, from Mr. Malarkey <br /> Southport— Basement flooding, 21 Executive Drive, from Dorothea Meehan <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.