Laserfiche WebLink
llrir. Doyle explained the existing travel way which is gravel is to be paved and <br /> relocated into the 0-f . way. Additional drainage is also being proposed. <br /> (Mr. Rowley arrived at the fleeting at this point, :10 p.m. <br /> The Town Planner suggested the end of pavement be more clearly shown on the <br /> plan. He also informed the Board that the Board of Health alth has not yet reviewed the plan. <br /> A formal review is platined for January 2d. <br /> After reviewing the plan Mr. Rowley asked for details on the depth of the <br /> drainage swale being proposed for the side of the road. <br /> Mr. Doyle responded, I don't know." <br /> Mr. Rowley asked about the connection of the two basins located near Great Neel{ <br /> Road. <br /> Mr. Doyle.-stated that perhaps some will have to be leaching basins. <br /> Mr. Rowley i f nn d the Board Chairman that he has no issue with the concept, <br /> but there is not enough detail shown on the plan for him to make an approval. There is <br /> not enough for a contractor to construct in the field, or for a method of measurement. He <br /> suggested additional detail.be submitted at some point, and/or that he speak with the <br /> engineer regarding drainage details. <br /> MOTION: Dennis Balzarini made a Motion to approve the preliminary plans in <br /> this matter subject to the following four Conditions: Pavement shall be. o-ft. wide; <br /> subject to Board of Health comments; storm drainage shall include pre-treatment.for <br /> nitrogen removal; and the plan shall show proposed end.of pavement. Said Motion was <br /> duly seconded by Thomas O'Hara and so voted unanimously. <br /> The Chairman signed a Certificate of Action in this matter. <br /> Performance Guarantee <br /> Release of Performance Guarantee—Prime Properties <br /> The Chairman called this matter to order and determined that Applicant was not <br /> present. <br /> The Town Planner explained that this matter is being addressed at the request of <br /> the Assistant Town Manager. He has had contact with Mr. l arsters, and has requested <br /> n inspection by the Consulting Engineer regarding the condition ofthe radars. <br /> Mr. Rowley reported that the road work is essentially finished. He was unable t <br /> determine whether or not all of the street bounds have been installed. He contacted Cape <br /> Islands Engineering to request that they review their records to determine if the <br /> 2 <br />