My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2014 ZONING BOARD OF APPEALS Minutes
>
11/12/2014 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 5:01:06 PM
Creation date
1/20/2022 1:19:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
11/12/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Louis J. Seminara <br /> 68 Echo Road (Map 19 Parcel 14) <br /> Mashpee, MA 02649 <br /> SP-2014-56 <br /> Mr. Furbush read the comments submitted by Catherine Laurent, DPW with the <br /> following conditions: <br /> • Denite system to be installed. <br /> • Board of Health approval needed at Board meeting. <br /> • Address buffers as advised. <br /> • Sign details incomplete. <br /> • Controlled construction required. <br /> • Discuss with Plumbing Inspector regarding floor drain requirement. <br /> • Recycling dumpster to be shown on Plan. <br /> • Curb cut pen-nit required. <br /> • Landscape Plan for the buffers requested for ZBA. <br /> Mr. Rowley addressed the Board and stated the same outstanding issues that apply <br /> to #58 Echo Road apply for#68 Echo Road listed below; <br /> • A final review of the drainage calculations. <br /> • He suggested a 100-year storm drainage calculation to make sure there is <br /> no off-site impact based on that 100-year storm with the undeveloped site <br /> condition. <br /> • He would like to see the ramps and steps in front of the doors to be concrete <br /> instead of asphalt to avoid water running underneath the doors. Asphalt <br /> tends to compress over time and shrinks and there would be a gap in <br /> between the edge of the pavement and building. It's a client preference but <br /> his recommendation. <br /> • He also wants confirmation regarding the number of parking spaces at#58 <br /> Echo Road based on the number of bays and the office space. The original <br /> plan only showed the office and one large bay,but the calculation showed <br /> eight (8)bays, and the number of bays were two (2). <br /> • He needs to review the transition from the Cape Cod Berm to the vertical <br /> curve on the plan. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.