My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/24/2013 ZONING BOARD OF APPEALS Decision
>
04/24/2013 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 4:27:48 PM
Creation date
1/20/2022 2:58:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
04/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> David M.Ferris&Ana S.Ferris <br /> 36 Seconsett Point Road(Map 124 Parcel 38) <br /> FINDING-2013-10 <br /> width, the first one hundred (100) feet of the front setback area shall be left wooded and in its <br /> natural state. Where such area is not naturally wooded, it shall be suitable landscaped with a <br /> sufficient number of trees or a type common in Mashpee to constitute a visual barrier between the <br /> proposed development and the roadway. Under no circumstances will parking, retention ponds or <br /> any other development involving clearance of natural vegetation be permitted within said area. <br /> Nothing herein is intended to prohibit appropriate tree surgery or similar maintenance of <br /> vegetation in this buffer area. <br /> 16 Any water or wetland, as defined under MGL C.131, §40, any existing or proposed street or <br /> any roadway, right-of-way or easement twenty (20) feet or more in width may not be counted <br /> toward lot size for the purpose of calculating maximum lot coverage. For lots in any cluster <br /> subdivision,maximum lot coverage shall be thirty(30)percent. <br /> History: Added 10-7-1991 ATM,Article 24,approved by Attorney General 2-3-1992. <br /> History:Amended 10-7-1996,ATM Article 28,approved by Attorney General 12-9-1996. <br /> 17 Except as otherwise allowed under§174-46,Open space incentive development. <br /> History: Added 10-7-1991 ATM,Article 24,approved by Attorney General on 2-3-1992. <br /> 18 Maximum height within the Popponesset Overly District shall be thirty(30)feet,subject to the <br /> provisions of Footnote 4 of this table. Minimum lot size shall be 6000 square feet, minimum <br /> frontage sixty(60)feet, <br /> minimum building setbacks 25 feet front, 15 feet rear and 15 feet side and maximum of lot <br /> coverage twenty <br /> (20)percent. <br /> History:Added 5-3-1993 ATM,Article 12,approved by Attorney General 7-19-1993. <br /> History: Amended 5-6-1997,ATM,Article 46,approved by Attorney General 9-25-1997. <br /> 19 These setback requirements shall not apply to the following building projections provided they <br /> do not exceed the sizes specified, as measured from the foundation line along a line perpendicular <br /> to the nearest property line: chimney projecting no more than three (3) feet, house overhang <br /> projecting no more than two (2) feet,roof overhang projecting no more than three and one-half(3 <br /> 1/2)feet, and open decks or platforms used for egress projecting no more than four(4) feet. These <br /> setback requirements shall also not apply to stairs required as a means of egress, basement <br /> bulkhead of the hatch door type or handicapped access ramps on private property used solely for <br /> the purpose of facilitating ingress or egress of a physically handicapped person, as defined in <br /> MGL C.22,§13A. <br /> History: Added 10-4-1993 ATM,Article 26,approved by Attorney General 10-18-1993. <br /> 20 Minimum front building setback within the Mashpee Overlay District shall be twenty(20) feet <br /> and maximum allowed building setback for the principal structure on a lot shall be forty(40)feet. <br /> Except as required by§174-25.1. <br /> History: Added 10-4-1999 ATM,Article 29,approved by Attorney General 1-11-2000. <br /> History: Amended 10-7-2002 ATM,Article 22,approved by Attorney General 11-27-2002 <br /> 21 Except that hotels and motels (and not other uses) approved by the Planning Board under the <br /> provisions of§174-45 may be increased to three(3)stories and forty five(45)feet,if approved by <br /> the Board,provided that there is adequate access for Fire Department vehicles and equipment and <br /> that all Fire Protection Construction Documents required by 780 CMR Subsection 903.1.1 of the <br /> Massachusetts State Building Code, have been submitted to the Planning Board and Fire <br /> Department as part of the special permit application and the Board is satisfied that the standards of <br /> said Subsection will be met. <br /> History: Amended 10-18-2004 ATM,Article 40,approved by Attorney General 12-16-2004 <br /> 22 Minimum front building setback within the Mashpee Center Overlay District shall be twenty <br /> (20) feet and maximum allowed building setback for the principal structure on a lot shall be forty <br /> (40)feet. <br /> History: Added 10-17-2005 ATM,Article 18,approved by Attorney General 3-7-2006 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.