Laserfiche WebLink
4a <br /> r <br /> The Board was in agreement that the 1 ' <br /> anguage of the Bond <br /> should be amended to incorporate the proposed changes as <br /> resented by the Town Planner. Mr g ". <br /> p Roberts agreed to request <br /> the Bond language be revised by the Bonding Company. (This <br /> matter concluded at 8 : p.m. } <br /> 20 p Y is <br /> Approval Not Required <br /> New Seabury Properties LLC--BSS Design-Rock ' <br /> EndorsementLanding Road ��c <br /> of 15-Lot ANR Plan ,r ; <br /> The Chairman recognized Tom Bunker, BSS Design, Falmouth, <br /> MA, who f i 1 ed Plan Deed Check, � � a ouch, ������� <br /> and Application in this matter. <br /> Mr. Bunker explained there have been slight revisions ma _`' <br /> to a Plan endorsed b ' Planning the Plan Board a de ,{�by one year <br /> ago. He presented a Plan of Land entitled,, "Plan of Land in � <br /> Mashpee, MA, Dated March 19, 1999, Prepared for New Se <br /> abury <br /> Properties LLC-being a subdivision of Lot 1387 as shown on, +� <br /> Land. <br /> Court Plan 11408--158 and Lot 1560 L.C.C. #11408, BSS Design" . <br /> g <br /> The Chairman entertained a motion to endorse be made ' <br /> MOTION: Dennis Balzarini made a Motion to endorse Approval <br /> Not Required Plan in this matter• whi pp q <br /> c h Motion was seconded by if <br /> James Dorgan and so voted unanimously. ' , <br /> Ito <br /> r The Chairman dated and signed the Plan. (This matter <br /> concluded at 8 :25 p.m. ) <br /> JJM i <br /> Discussion ,, f <br /> Charles Talanian-Don Megathlin � <br /> Southcape village outlet Center-Status Report Cape Col Co litp p Commission ,All . <br /> recognized Mr.. Me athl iIt"'.'�' �' <br /> The chairman reco . <br /> g g n who Informed the Board. <br /> of .. <br /> a site visit scheduled for 1: ❑0 p.m. on May 20, 1999 with the <br /> Cape Cod Commission. He invited available Board Members to <br /> attend. He also informed the Board of meetings with Deer <br /> Cross ' resi g <br /> .or g dents concerning the intersection at Shellback wa ' <br /> The ma Way. <br /> concern is for access through Mashpee commons to Jobs t� <br /> Fishing Road. . <br /> . i <br /> A <br /> 1 <br /> Mr. Megathlin informed the Board of meetings held with the <br /> Board of Health withg <br /> regard to LIFE/temporary wastewater, which y" <br /> is emerging as a major issue. The concern is that the Cape Cod <br /> Commission <br /> ' <br /> do not allow construction of anything that ��,. Ar <br /> has not been approved. <br /> r <br /> • Megathl in also reported on the following traffic issues., <br /> a � <br /> i <br /> There continue to be issues with the cape cod commission <br /> rl <br /> elated to receivingcredit for the connector road, <br /> d, which Issue <br /> remains to be resolved. The Commission would like to refer the <br /> connector road to the State endangered species program. <br /> — 141 <br /> �. <br /> L: <br /> 4'. <br /> t <br /> , . 04 <br />