Laserfiche WebLink
+ + <br /> i <br /> Our floId orow,ir, on ito way to tho cite to check out tho grades at tho low point end to <br /> stake parking <br /> the arkin areas_ <br /> l spoke with the town engineer, Charley Rowley Yesterday afternoon at approximately <br /> 5:00 PIVI. We reviewed the proposed changes in the drainage. Charley agreed that � <br /> what we propose is superior to ghat was proposed and has requested copies of the <br /> revised site plan and copies of drainage calculations. He will Present the plans and <br /> calculations to the board as field adjustments. Without the revised plans and drainage 1 <br /> 0.1 <br /> calculations, he can only report to the board that the work 'is not in conformity with the S <br /> fans, ' �' <br /> Also, Charley stated that he must inspect the base prior to the roads being aged. Ilk <br /> He has to be called and he requires notice, Le. you need to give him at.least 48 hours <br /> notice before you need him to make an inspection. l am not sure what aspects of theIs <br /> project need to be inspected by him, so you will want to ask him the next time you chart � <br /> with him. <br /> + V l <br /> I told Charley that you were hoping to pave on Friday, however the contractor warted to <br /> wait until Monday. He said that was good because he can't be there on Friday. ; <br /> El; <br /> If you have any questions, please contact me <br /> Copy To; Charles Rowley Y B Fax 1-508-296-11 g2 <br /> r <br /> C'My DQcumentsMindchime Mom Mae 4 <br /> n� <br /> i Ali. <br /> , <br /> t <br /> •n! �t k� <br />