Laserfiche WebLink
Ilk <br /> Ai.1 <br /> 1k <br /> S <br /> F �I <br /> :1k <br /> F <br /> FudIala noted that Design Review doesn't have sepmte authority—they just review and <br /> advise the Board. Mr.Fudala questioned Mr.Butler when the planning Board would receive �= • <br /> the actual building design and landsca in Tans to v w �aping p vote on, Mr.Butler stated that they have ,. <br /> a co of th l �copy a andseaping plans in the plans that were submitted. Mr.Butler stated that }• they � <br /> have been to Design Review and Design Review has made several suggestions on changes , <br /> they would like to see which include architectural <br /> and some landscaping. Mr.Butler furrier � �I <br /> stated that their plan is to go back to Design Review next Wednesday with revised to <br /> address their con i cerns and then submit to the planing Board plans to vote on. He w �{ <br /> added that what theyhave with them torsi <br /> tonight--the architectural drawings are fairly dose to a <br /> final determination from how the building would appear and the architectural materi&and <br /> colors are very close to a final selection. <br /> Mr.Fudala commented on the driveway that is located near the intersection. It is actually on <br /> the radius of the intersection mi terms of the road layout. He commented that it appears to be SO " <br /> awful close,particularly for traffic turning into it from Route 28. <br /> �r <br /> Mr.Butler stated that Resign Review also pointed that out. They are loold ng now at two <br /> possibilities---one possibility is relocation to the south a little bit and they other possNhty is to <br /> do away with it and move the other entrance further up and have one main entrance. The <br /> only issue there is access for fire. Mr.Fudala commented that it would work as a one- <br /> way <br /> out. 14� <br /> Mr.Fudala commented that the above seems to be the only signifaicant issue with the site lam _ <br /> that he Sees. p <br /> Mr.Butler stated that Design Review had regmted information on the name and that the <br /> name will be Mashpee Health Center. ,• <br /> !!1 <br /> ii► <br /> Mr.Butler concluded { <br /> by requesting that if the Board were to continue t0 the next mmfing, ' <br /> they would ask permission to submit proposed language for conditions,particularly the <br /> Development Agreement. <br /> Upon questioning by Consulting Engineer Charles Rowley,Brian Dunn reviewed the <br /> drainage for the proposed building along with the drainage calculations. <br /> Mr.Fudala commented that th have a Storm water meat <br /> ey Manage By Law in place now <br /> from May Town Meeting that would affect this project. He noted that a project like this will. <br /> have to develop a long-term storm water management plan. Mr.Fudala stated that he will F <br /> RAF <br /> eta � <br /> g copy of the article for them. <br /> Amer questioning if anyone had any comments,there were no public comments at this time. ► r <br /> .rsi.' I <br /> Revim of 1 sts b t e Plannln Board: <br /> Mr.Fudala reviewed what has been requested by the Planning Board:- <br /> 0 Design.Review"s finalized version of Architectural and Site Design.and <br /> .Landscaping which is all recommendation of the Board. <br /> * Concept design for the wastewater treatment facility"essentially a narrative ; ti <br /> and a description of that m. Mr.Fudala stated that he would like to see wFj <br /> l� � <br /> o� <br /> ,e �1 <br />