Laserfiche WebLink
LOTION: Dennis Bal arini made a Lotion to continue <br /> the Public Hearing in this matter to February 1 , 2003, at <br /> 7 : 35 p.m. ; which Motion was seconded by Steve Dolan and so <br /> voted unanimously. <br /> (This matter concluded at 8 : 13 p.m. ) <br /> Release of Performance Guarantee <br /> Gene Smith - Conaumet Highlands Subdivision - Lot 50 <br /> Continued from January 15, 200 <br /> The Consulting Engineer provided a report of his <br /> findings of inspection made to Southwind Circle; letter <br /> dated February 4, 2003. The entire roadway is in need of <br /> clearing from the sides; the base is pretty well oxidized, <br /> Two of the catch basins appear to be in good condition, the <br /> frames and grates are intact. There was no water in -either <br /> one . The interconnecting pipes appear to be in good <br /> condition as well. He did notice a pipe of unknown origin <br /> coning into the ba's-in at the outside of the circle. <br /> The profile of the road is virtually flat. The plan <br /> calls for two additional catch basins just before the <br /> intersection of the circle with Fox .Hill -Road. He is <br /> uncertain as to whether or not they -are in place. He spoke <br /> to the importance of constructing basins in the event they <br /> do not exist in order to prevent runoff into the lot under <br /> consideration. some measure should be taken to insure this <br /> is not the situation. <br /> The building located on Lot 56 has a garage facing Fox <br /> Hill -Road, however the front door of the house faces the <br /> circle . He. is unsure of the frontage of this lot. He <br /> recommended the entire circle be paved and that the <br /> existing base coat be repaired. <br /> The vegetation has grown out to the edge of the <br /> pavement; he mentioned the possibility of root matter <br /> underneath the pavement when the existing vegetation i <br /> cleared away. <br /> The Town Planner suggested Applicant obtain an <br /> estimate of costs to pave tip to the catch basins and repair <br /> of the base coat, and a separate estimate of costs to page <br /> the entire circle for consideration at the next meeting- <br /> 7 <br />