Laserfiche WebLink
O _ <br /> The Chairman recognized Matthew Eder, Baxter, Nye <br /> Holy gren, Civil Engineer, representing the Applicant . <br /> Ir. woody presented an exhibit plan, which indicates a <br /> design of the connector road, being a condition of -South <br /> Cape Village. Said plan entitled, "Preliminary <br /> Suibdiv- i ion, Commercial. Street,, Mashpee Industrial Park, <br /> iashpee, M , prepared for C. Talanian Realty Co. , Inc. , <br /> Developmen-t Plan, by Baxter-, Nye & Holmgren, Inc. , dated <br /> February 5, 0 ". <br /> Reference was made to a letter from the Consulting <br /> Engineer, Charles L. Rowley, PE RL , dated February 19, <br /> 2003, e,: Talanian Preliminary Subdivision, Items # 1 - 6. <br /> Road alignment - Language has been revised relating to <br /> grade topography issues, a:s well a.s a reduction of unused <br /> land created by the parcel . A portion of land will be. <br /> donated to the "down as conservation land. <br /> Drainage - To be addressed and designed in more detail <br /> in the definitive stage. The plan currently shows catch <br /> basins discharging into infiltration trenches, which will. <br /> be modified to show catch basins across drainage swils <br /> (roadside ditches) ,, i-nt another catch basin before going <br /> into the infiltration trench. <br /> Subdivision Name - will be changed to "Commercial <br /> Street Subdivision" . <br /> Road Takings - The connector road and Industrial <br /> Drive. <br /> Topography - Taken from the Town CIS, design of the <br /> connector road only. At the definitive stage, topo will be <br /> run along either side of the proposed center line at 50-100 <br /> feet to be used for drainage paths as well. <br /> Dimensional Data - in-imal data on lots a3 reguared b <br /> Preliminary standards are -shown. The definitive plan will <br /> show information along the right of way, as will the road <br /> profiles . <br /> Board of Health - As the plan provides for road design <br /> only, retention basins and delineation of soil absorption <br /> systems will not be proposed on this plan (to be addressed <br /> t the lot development and definitive plan Stages) . <br /> 10 <br />