Laserfiche WebLink
t <br /> Attorney Norse stated the lots conform to all current <br /> zoning, frontage, lot size, and road regulations. <br /> The Chairman recognized Dave Crispin, BBC Group, <br /> Engineer for the pr03ect . He made reference to the <br /> existing roadways and the 0-degree subdivision regulation. <br /> straight lime from the intersection to the existing <br /> roadway measures out to 58 degrees; a line at 100 f . <br /> circle radius measures out to 9 -deg-rees . He questioned <br /> whether or not a waiver should be requested. He also <br /> requested interpretation from the Board regarding the right <br /> of way compliance, and storm drainage preference. <br /> The Town Planner advised the building setback line shown on <br /> the plan does not conform to the zoning by-law. A straight <br /> li-ne between points on the sideline 0-feet back from the <br /> street lime should be established. Also, the minimum <br /> street frontage must be calculated in a straight lime, not <br /> along a curve <br /> The Consulting Engineer is more concerned with <br /> achieving as close to a 90-degree intersection/paving <br /> situation as possible. <br /> ! The Town Planner suggested a waiver should be <br /> requested granted.. Storm drainage is required in current <br /> zoning. <br /> (This matter concluded at 7 :33 p.m, ) <br /> Public Hearing <br /> Industrial Communications a.nd Electronics, Inc. <br /> 54 Echo Road - Assessors' Map 19, Block 2 <br /> Approval of Special Permit Application <br /> Wireless Communications Tower <br /> The Chairman entertained a Motion to continue be made . <br /> MOTION: Don Dyers made a Lotion to continue the <br /> Public Hea-ring in this matter to May 7, 2003, at 7 : 4 5 p.m. ; <br /> whih Motion was seconded by Dennis Palza,rini and so voted <br /> unanimously. <br /> The Chairman recognized Attorney John Kenney,r, who <br /> expressed a -wish to have been able to have been heard this <br /> evening. <br /> 4 <br />