My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2003 PLANNING BOARD Minutes
>
04/23/2003 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:07:17 PM
Creation date
1/21/2022 1:33:26 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/23/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br /> f <br /> The 'down Planner explained Town' Counsel' s advice to <br /> continue the matter until such time as the 0-day appeal <br /> period is over. <br /> The Chairman concurred it would be unfair for the <br /> Board to hear Attorney Kenney' s comments as the same <br /> opportunity had not been extended to the previous wireless <br /> communications- Applicant,. She suggested any further <br /> discussion be continued to May 7th <br /> The Chairman them recognized Dona.1d Coder, Director of <br /> Operations, Industrial Communications. He ,informed the <br /> Board that the appeal period with regard to this matter <br /> ends on May 9th. There was some discretion as to the actual <br /> date the decision was made . <br /> Attorney Kenner volunteered to verify said date and <br /> report back to the Board. He also requested the date for <br /> continuance remain at May 7th. <br /> C. Talanin fealty Co. <br /> South -Cape Village <br /> Approval of Modification to special Permit <br /> The Chairman recognized Don Iegathlin, Talanian <br /> Realty, who presented a plan entitled "South Cape Village <br /> Site Plan Proposed Development"; and ""Traffic Circulation <br /> at South Village. . He introduced Charles Talanian, <br /> President and Owner of Talan-ian Realty. <br /> Mr. Ie.gathlin explained said plan is very similar to <br /> the original plan submitted several years ago. All retail <br /> development, same square footage and building limit line, <br /> with an emphasis on small tenants. <br /> Proposed Changes - Buildings A and B have been <br /> combined for a total square footage of 56, 000 square feet. <br /> Buildings C and D have been reconfigured to two separate <br /> buildings. There are four buildings on Route 28 with two <br /> parking lots . The landscaped pedestrian plaza extends t <br /> the green space along Route 28 . The surer treatment <br /> gatehouse, restrooms, electric tran-sformer, and bus stop <br /> have all been relocated. <br /> Regulatory Issues - MEPA approval received Larch 28th <br /> Public Hearing Cape Cod Commission (hereinafter referred to <br /> as CCC) subcommittee approvals received April loth. Monthly <br />
The URL can be used to link to this page
Your browser does not support the video tag.