My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2003 PLANNING BOARD Minutes
>
06/18/2003 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:08:14 PM
Creation date
1/21/2022 1:36:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/18/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti <br /> been added that will require Fire Protection onstruc . -ion <br /> Documents be submitted and filed as part of any Application <br /> for Special -Permit for Hotels/Motels . <br /> Open space and buffer re 'uirements have- arl o been <br /> included to the Article, with an option for the Planning <br /> Board to reduce the size of the -buffer if warranted. Also, <br /> the required open space will be eliminated in the I-C <br /> Overlay District. <br /> The 'horn Planner suggested that these Articles be <br /> submitted to the Board of Selectmen for their support a <br /> sponsor of the Articles in con unction with the Planning <br /> Board. <br /> The Torn Planner them presented the Board with copies <br /> of a Parting By-law Articler as well as the Explanation <br /> thereto. He pointed out the changes suggesting the Board <br /> review the materials for discussion at a later date <br /> (parking space size and length requirements, required <br /> number -of -spaces, shared panting spaces, one parking space. <br /> for even three seats for churches, parting lot design <br /> standards, perimeter parting lot curbs and gutters, <br /> - - - landscaping.. requi-reme -ts-)-. - - - - <br /> Correspondence <br /> The Town Planner addressed the correspondence being <br /> solicitation for ,business regarding 40B projects . <br /> Town Counsel response to the appeal regarding the <br /> Tal.anian project. <br /> Correspondence to the Consulting Engineer regarding <br /> concerns with the stone used in construction at Miller Farm- <br /> Road. <br /> Invitation, osprey Labe ribbon cutting ceremony. <br /> Executive Session <br /> The Town of Mashpee Planning Board entered into <br /> Executive Session at p.m. A motion having been duly <br /> made and seconded to do so. Executive Session concluded at <br /> 1 : oo P.M. <br /> Adjournment <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.